Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Demolition, site work, paving and new construction of a mixed-use development in Saint Clair, Missouri. Conceptual plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Bridge Replacement and Rebuild Pavement From 1.3 Miles East of Bethel Church Road to 0.1 Mile West of Oak Grove Church Road and Upgrade Pedestrian Facilities to Comply With the Ada Transition Plan at Bardot Street. Project Involves Bridges H0994 and H0995. Length : 0.85 Route : MO 30 County : Franklin award date : 2026 As of September 09 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026 MODOT- Bridge Replacement - MO 30 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$8,068,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
State Rte 30, Saint Clair, MO
Related To This Project
Saint Clair, MO
Bid Date: Mar 10 2021
Saint Clair, MO
Bid Date: Aug 15 2025
Saint Clair, MO
Bid Date: May 14 2025
Saint Clair, MO
Bid Date: Jun 20 2025
Saint Clair, MO
Bid Date: Oct 18 2024
Saint Clair, MO
--
Saint Clair, MO
Bid Date: Oct 02 2025
Saint Clair, MO
Bid Date: May 16 2025
Saint Clair, MO
Bid Date: Jan 26 2024
Saint Clair, MO
Bid Date: Jan 19 2024
Saint Clair, MO
Bid Date: Feb 10 2022
Saint Clair, MO
Bid Date: Dec 28 2021
Saint Clair, MO
Bid Date: Apr 21 2023
Saint Clair, MO
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
