Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Renovation of an educational facility in Waterville, Minnesota. Completed plans call for the renovation of a 22,012-square-foot, three-story above grade educational facility; 81,820-square-foot, three-story above grade educational facility; 48,358-square-foot, one-story above grade educational facility; and 3,752-square-foot, one-story above grade educational facility.

**As of October 21, 2025, the project was awarded to the following contractors: Brennan Construction in the amount of $587,000.00 Summit Fire Protection in the amount of $59,470.00 R&K Electric, Inc in the amount of $195,100.00 Gemini 26 Inc., dba Bauernfeing Goedtel in the amount of $2,585,000.00 with a total awarded amount $3,426,570.00. Waterville-Elysian-Morristown Phase II HS HVAC Project LOCATION OF WORK: Waterville High School 500 East Paquin St. Waterville, MN, 56096 The WEM Phase II project focuses mostly on Indoor Air Quality (IAQ) renovation work along with a few architectural and interior finish updates. Most of the work being done is on the mechanical system of the high school side, from the basement to the roof. The updates to the ductwork, piping, and mechanical units, will require areas of ceiling replacement - in these areas, new lighting fixtures will be installed. Structural involvement is limited, but there will be additional bracing for new mechanical equipment and ducting and penetrations through walls. Architectural and interior finish updates include a refreshed Bandnand Choir area with updated casework, new doors, and efficient storage solutions. The WEM Phase II project focuses mostly on Indoor Air Quality (IAQ) renovation work along with a few architectural and interior finish updates. This project will consist of Multiple Work Scopes to include: WS 1 - General Construction WS 2 - Fire Protection WS 3 - Mechanical WS 4 - Electrical Schedule: Onsite work will begin on the premises no later than June 1st, 2026. Substantial completion by August 21st, 2026. Prevailing Wage: No

Award

Educational

$3,426,570.00

Public - City

Renovation

69

33

28

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
155
Bidding Soon
1,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

June 1, 2026

Project location map

500 Paquin St E, Waterville, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.