BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work for a mixed-use development in Mission Viejo, California. Working plans call for site work for a educational facility.

**As of November 13, 2025, bids received were rejected. Project will be rebid in January.** Project Preliminary Cost Estimate. The Preliminary Cost Estimate to complete Project construction is $750,000.00. The Preliminary Cost Estimate is provided for reference purposes only. Bidders must independently evaluate Project requirements and propose a price for completing Project construction and other obligations under the Contract Documents based on each Bidder s independent evaluation. Bidders must submit Pre-Bid inquiries or clarification requests through the PlanetBids portal. Pre-Bid questions or clarification requests musts be submitted no later than 10/08/25 at 5:00 PM. Bid Security. Bid Proposals must be submitted with Bid Security in an amount equal to ten percent (10%) of the Bidder s proposed price to complete Project construction and obligations under the Contract Documents Rejection of All Bid Proposals; Waiver of Irregularities. The District reserves the right to reject any or all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding. Description of Work: Miscellaneous stadium improvements, both exterior and interior, including, but not limited to: 1. Under-bleacher screening (fencing and gates) and lighting 2. Screening (fencing and gates) at Ticket Booth AHU locations 3. Reorientation of pole-mounted play clock 4. Addition of gate controls and access controls to the vehicular gates at the Emergency Vehicle Access (EVA) Road 5. Addition of acoustical measures at the scoreboard speakers 6. Addition of fencing at specified gaps 7. Removal of existing and installation of new safety netting at the Thrower's Park 8. Addition of protective padding at existing Thrower's Park light poles 9. Addition of protective covers at existing utility grade boxes at Thrower's Park 10. Addition of potable water hose bibs within the Visitor bleachers 11. Added landscaping and irrigation (reclaimed water system) 12. Addition of motorized projects screens in Team Rooms 13. Carpeting of the Officials Rooms 14. Conversion of existing interior window system to pass-thru window at Press Box 15. Addition of Audio Visual (AV) components to integrated the scoreboard and field audio system into the existing buildings. 16. Addition of corner guards at existing unprotected columns. 17. Alternate to add decorative bollards along College Drive Project Location: 28000 Marguerite Parkway, Mission Viejo, CA 92692

Final Planning

Playgrounds / Parks / Athletic Fields

$682,800.00

Public - County

Site Work

54

7

30

8

Subscribe For Documents

161 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
75
Bidding Soon
4,020
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

May 13, 2026

Project location map

28000 Marguerite Pkwy, Mission Viejo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.