Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 4, 2025
Site work and paving for a civil project in Saint-Hubert-Riviere-du-Loup, Quebec. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
Reference number: 20093448 Deadline for receipt of complaints 2025-09-22 Expected duration of the contract without options (in months) 1 The Municipality of Saint-Hubert-de-Riviere-du-Loup is seeking tenders for repair work on Chemin du Lac St-Francois. - Call for tenders for the repair of ditches along Chemin du Lac St-Francois, 5.5 km section. - Ditch 1,000 mm deep by 2,200 mm wide, with a 200 mm flat bottom. - Please note that in several places, the ditch consists of rocks and tuff. - Private entrances must be removed and reinstalled. Existing culverts will be retained if they are in good condition and measure 450 mm; otherwise, they will be replaced with new 450 mm concrete culverts. - Ditches will be aligned by means of staking at the maximum limit of the municipal right-of-way. - Three sections will be refilled with 500 mm of MG-20 over a length of 190 m, 150 m and 150 m by 7 m wide, extended with 2% slopes on each side. The work must be completed by autumn 2025.
Post-Bid
Bridges / Tunnels
$300,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2025
November 3, 2025
Multiple Locations, Saint-Hubert-Riviere-du-Loup, QC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
