BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work and paving for a civil project in Gillette, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Remove and replace approximately 704 LF of 6"and 8" PVC water main with standard trenching,abandon and horizontal directional drillapproximately 873 LF of joint restrained 8" C900PVC water main, 507 LF of 1" poly services,including fire hydrants, test stations, valves, fittings,curb stops, and appurtenance replacement andupgrades within O'Hara Drive from Butler SpaethRoad to the end of the O'Hara Drive cul-de-sac, andwithin O'Henry Court. Also includes minorupgrades and adjustments to sanitary sewermanholes. Includes varying width of full depthpavement removal and replacement along O'HaraDrive and O'Henry Court. Full depth removal andreplacement of approximately 3,591 SY of asphalticconcrete pavement and aggregate base course tosupport utility efforts, along with minorimprovements to adjacent concrete curb and gutter,driveways, valley gutters, fillets, ADA ramps,sidewalk, hydrant splash pans, and landscaping asappropriate and identified in the plans. Bids Must Be Appropriately Marked: Ohara Drive - Water Main Replacement 25en22 The City of Gillette Reserves The right to Reject Any and All Bids. Question Deadline 09/22/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing, Questions received less than ten days prior to the date for opening of Bids may not be answered

Bid Results

Water / Sewer

$850,385.00

Public - City

Paving, Site Work

40

5

4

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
12
Bidding Soon
91
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

December 1, 2025

Project location map

Ohara Dr, Gillette, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.