Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 23, 2025
This is a service / maintenance or supply contract in Dallas, Texas. Contact the soliciting agency for additional information.
This is a Request for Information (RFI) only. This RFI is not accepting applications for financial assistance. The purpose of this RFI is solely to solicit input for ARPA-E consideration to inform the possible formulation of future programs. RFI - Active Substations with Flexible Large Power Transformers The purpose of this Request for Information (RFI) is to solicit input for a potential future ARPA-E program to support research and development (R&D) projects focused on technologies to improve the resilience, reliability, and security of the electric grid through innovations in substations. The goal of this potential R&D effort is to support the development of technologies that fast-track the manufacturing of large power transformers (LPT) and other substation components, while increasing their modularity, performance, functionality, and power density. ARPA-E is seeking information at this time regarding transformative, scalable, and rapidly deployable technologies that could: - Reduce the cost, lead time, and size of substation components; - Reduce the requirement for critical materials in substations and the grid; - Improve the power capacity of existing infrastructure; - Improve the stability and resilience of the grid; and - Enhance protection of substation assets from cybersecurity threats. ARPA-E is requesting information about substation-related problems and the technological innovations that could address those problems. While significant and wide-ranging opportunities for improvement exist, ARPA-E programs seek to identify specific priority areas for technology development to make maximum impact. Therefore, this RFI solicits input from a wide range of disciplines and stakeholders such as power systems and power electronics experts, transformer manufacturers, substation developers, magnetic material scientists, energy storage experts, and other related communities to explore innovative and disruptive ideas related to active substations.
Post-Bid
Power Plant
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
October 22, 2025
Multiple Locations, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
Bid Date: Oct 10 2025
Dallas, TX
--
Dallas, TX
Bid Date: Sep 11 2025
Dallas, TX
Bid Date: Sep 24 2025
Dallas, TX
--
Dallas, TX
Bid Date: Sep 23 2025
Dallas, TX
Bid Date: Sep 12 2025
Dallas, TX
--
Dallas, TX
Bid Date: Nov 19 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Sep 10 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
