BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a road / highway in Stettler, Alberta. Completed plans call for site work for a road / highway.

Location 1: Museum mill & overlay - The work to be completed is as follows: 1. Supply and install new hot mix asphalt at Museum, located at 6502-44 Ave in Stettler. Mill and overlay new hot mix asphalt to a depth of 75 mm. Contractors will be required to mill and pave +/- 970 square meters. 3-inch depth (75 mm) is desirable and must be tied into existing asphalt. Location 2: New Firehall - The work to be completed is as follows: 1. Supply and install new hot mix asphalt on south end of building, located at 4204-38th street in Stettler. Pavement will extend out from existing concrete pad. Trim out existing crushed gravel base to a depth of 150 mm and dispose of gravel. Reshaping, minor grade work, and compaction of area prior to paving will be required. Contractors will be required to pave +/- 240 square meters. 6-inch depth (150 mm) is desirable to help support the large fire trucks in this location. Location 3: Interpipeline approach access - The work to be completed is as follows: 1. Supply, place, and compact new hot mix asphalt for Interpipeline approach access, located along Range Road 203 (field office). Trim out existing crushed gravel base to a depth of 150 mm and dispose of gravel. Shape and compact existing suitable and acceptable crushed gravel base to prepare for paving. Contractors will be required to pave +/- 210 square meters. 6-inch depth (150 mm) of hot mix asphalt is desirable to help support the large trucks in this location. Location 4: Gadsby 2nd Street Repair 1. Saw cut perimeter of area to be repaired, excavate/remove existing +/- 0.075m pavement and +/-1.0m of structural material down to a suitable base. 8-meter-wide excavation requested. 2. Reconstruct Road. Clay backfill topped with a geotextile layer, topped with 0.3m of pit run, 0.15m of 3/4 inch granular base course. Material volumes measured compacted in place @ 98% SPD. 3. Prepare base, prime and re-pave. 165m long, 6 meter wide, 0.075-meter-thick ACP top, with a standard 2% crown. Tie-ins to existing road tops will be required Questions regarding the above may be directed to; Justin Caslor, C.E.T., Manager of Engineering & Facilities (403) 742 - 4441 (Ext. 178) or jcaslor@stettlercounty.ca

Post-Bid

Roads / Highways

$75,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
97
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

October 1, 2025

Project location map

Multiple Locations, Stettler, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.