BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 12, 2025

Renovation of a mixed-use development in Granville, New York. Completed plans call for the renovation of a educational facility.

The Owner, the Granville Central School District will recieve sealed bids to furnish material and labor to complete the 2024 Capital Project Phase 2 which includes renovations and alterations. Each bid shall be on a stipulated sum basis for the following contracts: The Owner, the Granville Central School District will recieve sealed bids to furnish material and labor to complete the 2024 Capital Project Phase 2 which includes renovations and alterations. Each bid shall be on a stipulated sum basis for the following contracts: Project scope includes but is not limited to: MSHS: Science Classroom renovations; Auditorium renovation; Fine Art wing renovations; Toilet Room renovations; Exterior bleachers; Pavement and plaza reconstruction; Fire Alarm replacement; UV replacement; Boiler Plant replacement; Secure Vestibule GES: Boiler plant replacement; Secure Vestibule; Pavement reconstruction MJT: Boiler Plant replacement; Secure Vestibule; Flooring replacement; construction of bypass road; pavement and sidewalk reconstruction; UV replacement BG: Toilet Room and Office renovations; Full parking lot reconstruction and reconfiguration; Fueling Island and UG tank replacement and relocation; Heating System Bidder must provide Bid Security in the amount and form, per the terms indicated in Section Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days following the receipt of Bids. The Owner may, in its sole discretion, reject any Bid and return Bid Security prior to that date. Bids shall not include New York State sales and compensating use taxes on materials and supplies incorporated into the Work, as the Owner being exempt therefrom. Bidders must comply with New York Sate Department of Labor Prevailing Wage Rate Schedule and conditions of employment. This project is publicly funded. The Bidders must comply with New York State Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The Granville Central School District reserves the right to waive any informalities or irregularities in the Bids received, and/ or to reject all Bids without explanation. By Order of: Granville Central School District, Board of Education Jr./Sr. High School 64-07-01-04-0-001-028 Granville Elementary School 64-07-01-04-0-013-015 Mary J. Tanner Elementary School 64-07-01-04-0-014-013 Bus Garage 64-07-01-04-5-002-009 Question Deadline 09/29/2025 Interpretation in writing, addressed to CSArch, Attention: Elizabeth Brutsch, 40 Beaver Street, Albany, New York 12207, by e-mail: ebrutsch@csarchpc.com, to be given consideration must be received at least seven (7) business days prior to the date of the Bid Opening.

Post-Bid

Educational

$1,300,000.00

Public - City

Renovation

289

39

56

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
129
Bidding Soon
1,466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

December 5, 2025

Project location map

Multiple Locations, Granville, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.