BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Renovation of a power facility in Detroit, Michigan. Completed plans call for the renovation of a power facility.

Reference Number 0000398042 Bid Intent Not Available Uninterruptible Power Supply (UPS) and Battery Replacements to include installation, removal/disposal of old unit, all material labor and training for Central Substation. Question Deadline 09/18/2025 at 8:00 PM ET Questions are submitted online Yes, The DTC is on an aggressive schedule for this procurement; therefore, written questions related to this project must be received via online. Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Insurance Required - Safety Standards Plan - Training Required - Warranty Information Required Award Requirements - All or None Award DTC reserves the right to postpone, accept or reject any or all proposals, in whole or in part, for sound, documentable, business reasons, subject to the rules and regulations set forth by the DTC, the State of Michigan and the United States Department of Transportation. This document details the actions required for the replacement of a 160 kVA Uninterruptible Power Supply (UPS) unit and eighty units of 3CX-11 or equivalent batteries, which are critical to the operational reliability of the Detroit People Mover System. The existing UPS has reached the end of its operational life, necessitating immediate replacement to ensure uninterrupted standby power and facilitate a seamless transition to generator support during operational contingencies. This project encompasses the complete supply, installation, demolition, and environmentally responsible disposal of outdated equipment, performed in strict adherence to local and federal regulations. A mandatory site walkthrough and documented verification process will occur prior to the delivery or installation of any new equipment. All assessments, checks, and tests will be thoroughly documented, with results provided to the Detroit Transportation Corporation (DTC) in both written and electronic formats. The following documentation must be submitted in electronic format: a site-specific installation plan, a commissioning plan, a training plan for up to fifteen personnel, and a demolition/disposal plan. These documents must receive approval from the DTC before project commencement. Installation activities will be scheduled during non-operational periods to minimize disruptions. Furthermore, a DPM contractor safety course and a site-specific safety plan must be developed and approved by the DTC safety team before any work or equipment delivery. The DTC and its technical team retain the right to decline any submissions that do not meet the outlined specifications or quality standards. Objectives o Design and Implementation: Develop and implement a state-of-the-art 160 kVA UPS system, complemented by an efficient battery backup solution tailored to operational requirements, ensuring optimal performance and reliability. o Operational Continuity: Guarantee minimal disruption to existing services during the transition process, safeguarding the reliability and efficiency of the Detroit People Mover. o Regulatory Compliance: Adhere rigorously to all regulatory requirements governing installation, disposal, and safety protocols throughout the project lifecycle, ensuring accountability and transparency. Equipment Supply o UPS Specifications: Supply a new 160 kVA UPS unit that meets or exceeds the defined technical specifications outlined in the project requirements. o Battery Specifications: Provide 80 units of 3CX-11 CAT NO. 610107-CW or equivalent batteries capable of supporting the UPS under full load conditions. o Accessory Components: Include necessary components such as battery racks, interconnect cables, bus bars, monitoring equipment, and safety devices. o Updated Single Line Drawing: Deliver a revised single line drawing that accurately reflects the new system configuration and its integration with existing infrastructure. Approval from DTC is required in advance. Demolition and Disposal Existing Equipment Removal: o Carefully dismantle the existing UPS unit and batteries, ensuring all electrical connections are safely disconnected and power is fully isolated prior to removal. o Hazardous Material Handling: o Identify and manage hazardous materials in compliance with local and federal regulations (e.g., lead-acid batteries). Properly label and store hazardous materials until disposal by licensed hazardous waste contractors. Disposal: o Ensure all decommissioned equipment and materials are disposed of in accordance with environmental regulations, providing documentation of disposal methods and certificates of recycling or disposal for all materials. Installation Work shall be performed during non-service hours from 12:30am to 5:30am at MCF building 1250 Park Place, Detroit, MI Site Preparation: o Conduct a thorough site assessment to ensure readiness for the installation of the new UPS and battery systems, verifying that the installation area meets all necessary ventilation, accessibility, and safety standards. Installation of UPS Unit: o Install the new UPS unit according to manufacturer specifications and local codes, ensuring that all electrical connections are made using appropriate materials and methods to guarantee safety and efficiency. All equipment used to test, and install must have a current, traceable certification. Battery Installation:

Post-Bid

Power Plant

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
177
Bidding Soon
2,763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

November 5, 2025

Project location map

1250 Park Pl, Detroit, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.