BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work for a bridge / tunnel in Miramichi, New Brunswick. Completed plans call for site work for a bridge / tunnel.

The scope work involves replacement of the existing steel culvert pipe located on Flett Street crossing the Carding Mill Brook with two (2) new round concrete pipes as per our design and specifications. Work to include, but is not limited to, installation of temporary water controls measures, erosion control measures, fish rescue, demolition and removal of the existing culvert pipe, installation of the new culvert pipes, riprap, paving, and all associated restoration work. Question Deadline: Fri Sep 26, 2025 11:00 AM (ADT) Document Available At Online at https://miramichi.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/ffc1def7-6183-4905-8818-d5bedb0d1eb0

Bid Results

Bridges / Tunnels

$643,943.00

Public - City

Site Work

10

13

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
16
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

October 22, 2025

Project location map

Flett St, Miramichi, NB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.