Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work for a civil project in Cardington, Ohio. Completed plans call for site work for a water / sewer project.

As of November 06, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. The Project Includes the Following Work: A New Sludge Dewatering Building Including Rotary Press, Sludge Feed Pump, Sludge Belt Conveyor, Polymer Feed System, Air Compressor, Booster Pump Skid, Receiving Conveyor, Piping, Electrical & Instrumentation Work, Mechanical and Plumbing Work, Scada System Improvements, Digester Piping Improvements and Sludge Drying Bed Improvements. The Project Has an Expected Duration of 260 Working Days. Bids Shall Be Accompanied by a Bid Guaranty Bond for the Full Amount (100%) of the Bid, in Favor of the Owner or a Certified Check, Cashiers Check, or Letter of Credit Pursuant to Chapter 1305 of the Ohio Revised Code, in the Amount of 10% of the Bid, Payable to the Owner. Instructions to Bidders. The Owner Reserves the Right to Reject Any and All Bids, to Waive Any Informalities in the Bids Received, and to Accept Any Bid Which It Deems Most Favorable. IMPROVEMENTS TO THE EXISTING CARDINGTON WASTEWATER TREATMENT PLANT (WWTP) TO CONSTRUCT A NEW BUILDING THAT HOUSES A SLUDGE DEWATERING SYSTEM THAT INCLUDES A ROTARY FAN PRESS INSTALLED IMMEDIATELY UPSTREAM FROM THE EXISTING SLUDGE DRYING BEDS. Question Deadline 10/03/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer through Bid Express or the Engineer's email as provided The project consists of the construction of a new sludge dewatering building and modifications to the existing digesters and sludge drying beds: 1. New Sludge Dewatering Building a. CMU Block Building b. Rotary Dewatering Press and Flocculator c. Sludge Feed Pump d. Belt Conveyor e. Screw Conveyor f. Polymer Feed System g. Air Compressor h. Booster Pump Skid i. Mechanical HVAC work j. Electrical & Instrumentation Controls work k. Plumbing work (potable water, trench drains, sink, eyewash etc.) 2. Existing Sludge Drying Beds a. Demolition as shown on Bid Drawings b. Installation of sludge cake conveyance piping 3. Installation of new sludge feed pump suction piping in the digesters with isolation valves. 4. Site work includes yard structures, site piping, site electrical, site grading and access drive work. 5. SCADA System Improvements 6. Electrical work in the headworks electrical room to feed the new sludge building 7. Gas line work to feed the new sludge dewatering building

Bid Results

Water / Sewer

$2,424,493.00

Public - City

Site Work

45

31

14

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
158
Bidding Soon
2,850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2025

December 9, 2025

Project location map

209 Richelderfer St, Cardington, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.