BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 12, 2025

Site work and paving for a mixed-use development in Lawton, Oklahoma. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of November 11, 2025, project was awarded to T&G Construction, awarded amount is $3,669,348.45. Rehabilitate approximately one mile of asphalt pavement; remove and replace curb and gutter sections; reconstruct driveways and street returns. Time for Project Completion: 240 Calendar Days Bid Bond: A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. Deposits will be returned to successful bidder upon execution of contract documents. The City Council of the City of Lawton reserves the right to reject any or all bids. The Contractor hereby agrees to commence work under the Contract on a date specified in a written "Notice to Proceed" of the Owner, and to fully complete the project within (240) consecutive calendar days. The Contractor further agrees to pay as liquidated damages, the sum of Two Thousand Dollars and 00/100 ($2000.00) for each consecutive calendar day thereafter as provided in the Contract and General Conditions. The Contractor shall deliver the executed contract and all required surety bonds within ten (10) days upon receipt of the contract from the Owner. With the execution and delivery of the Contract, the Contractor shall furnish and file with the City in the amounts herein required, the surety bonds listed below. The surety on such bonds shall be a duly authorized surety company satisfactory to the Owner. A. A good and sufficient Performance Bond in an amount equal to one hundred percent (100%) of the approximate total amount of the Contract, guaranteeing the full and faithful execution of the work and performance of the Contract and for the protection of the City and all property owners interested against any improper execution of the work or the use of inferior materials. B. A good and sufficient Statutory Bond in an amount equal to one hundred percent (100%) of the approximate total amount of the Contract, guaranteeing payment for all labor, materials, and equipment used in the construction of the project. C. A good and sufficient Maintenance Bond in an amount equal to one hundred percent (100%) of the total amount of the Contract, guaranteeing the maintenance in good condition of such project for a period of two (2) years from and after the time of its completion and acceptance by the City.

Award

Roads / Highways

$3,669,348.00

Public - City

Paving, Site Work

44

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
51
Bidding Soon
680
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2025

December 12, 2025

Project location map

Multiple Locations, Lawton, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.