Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and renovation of a mixed-use development in Charleston, Illinois. Completed plans call for site work for a bridge / tunnel; and for the renovation of a educational facility.
Repair Utility Tunnel & Upgrade Boiler PROJECT DESCRIPTION: The project provides for repairs of steam tunnels at Eastern Illinois University's main campus in Charleston, IL. Structural elements of concrete and corrugated metal pipe tunnels will be repaired or replaced, as well as supports for piping and other utilities. Steam piping will be replaced and resized to accommodate connection of the Renewable Energy Center's two main boilers to serve the main campus after future removal of the primary boilers in the Boiler Plant. The project will include installation of directburied steam piping, condensate return, and associated expansion loops, vaults, traps, and insulation to connect the Renewable Energy Center boilers to the main Campus loop. MBE/WBE Subcontracting and Supplier Goals Apply Minority / Female Utilization Percent Sheetmetal 25% Equipment operators 20% Elevator Mechanics 12% Ironworkers/Boilermakers 20% Carpenters 25% Acoustical Tilers 20% Ceramic Tile Setters 15% Brick Masons/Tuckpointers 15% Cement Masons 15% Lathers (Metal/Wood) 20% Tapers 20% Plasters 12% Painters 20% Glaziers 15% Roofers 25% Metal Deck Roofers 15% Pipefitters 25% Plumbers 25% Insulators 15% Temperature Control 12% Laborers 33% Electricians 25% Fencing, Guard Rails 12% Landscaping 20% Truck Drivers 20% Air Test & Balancing 0% Sandblast/Waterproofing/Caulkers 0% Asbestos Workers 30% Terrazzo 12% Carpet 15% PLA Applicable Yes For additional assistance related to the e-Builder system, email CDB.eBuilderSupport@illinois.gov. Questions submitted through the e-Builder module will not reviewed or responded to. Substantial Completion - (820) consecutive calendar days + (Final Acceptance) within ninety (90) consecutive calendar days from the date of Substantial Completion.
Bid Results
Educational
$30,941,650.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2025
December 29, 2025
1720 7th St, Charleston, IL
Related To This Project
Charleston, IL
Bid Date: Nov 07 2025
Charleston, IL
Bid Date: Oct 30 2025
Charleston, IL
Bid Date: Oct 30 2025
Charleston, IL
--
Charleston, IL
--
Charleston, IL
--
Charleston, IL
Bid Date: Sep 02 2025
Charleston, IL
Bid Date: Jul 08 2025
Charleston, IL
Bid Date: Jul 09 2025
Charleston, IL
Bid Date: Jun 10 2025
Charleston, IL
Bid Date: Jun 10 2025
Charleston, IL
Bid Date: Jun 10 2025
Charleston, IL
Bid Date: May 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
