BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Site work for a civil project in San Francisco, California. Completed plans call for site work for a water / sewer project.

Question Deadline 10/06/2025- Bidder shall at once notify the City in writing using the Questions on Bid Documents ("QBD") form Section No. 00 21 14. Delivery shall be via facsimile at: (415) 553-4896 or email to Qbd@sfwater.org. The City may not answer questions received less than 10 days prior to the date for opening Bids. The objective of the project is to remove the existing butterfly valve at the Sansome Street Outfall and install new bending weirs. The project also includes the construction of new concrete wall in the outfall, construction of new ductbank and the installation of electrical and monitoring equipment. The work is to be performed in San Francisco, California. The Local Business Enterprise (LBE) subcontracting requirement is 14.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs. LBE sub participation requirement is below 20% due to the specialized nature of the contract work, including concrete repairs and concrete wall rehabilitation which are all done in a confined space and a marine environment. Only specific qualified contractors will be able to perform the work. Also, the installation of the bending weir has never been performed by the City. PUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Form 2B, except those who exceed the abo vestated subcontracting requirement(s) by at least 35%. Refer to Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract a ward. Please contact Jovi Cuntapa y-Vitin at (415) 554 0632 or jovineth.cuntapay-vitin@sfgov.org for further information about the LBE requirements. Subcontracting opportunities may include, but not limited, to the following major types of work: traffic control, concrete work, baffle wall installation and electrical work. SFPUC encourages Bidders to complete the Safety Prequalification Web Form at least 3-weeks prior to the date of Bid opening Bidders. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders that have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, "Bidder Qualifications" and the website listed above for additional information BOE FILE NO. 128.055

Bid Results

Water / Sewer

$3,322,700.00

Public - City

Site Work

65

30

2

11

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
147
Bidding Soon
3,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

March 30, 2026

Project location map

Sansome St, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.