BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2025 at 8:00 PM

Updated October 22, 2025

Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.

PROJECT DESCRIPTION/SCOPE OF WORK: This project involves hazardous material abatement and reglazing of the TLS Greenhouses (GH-1, GH-2, GH-3) at the University of Connecticut. Work includes removal of all single pane glazing and compression brackets (roof only), cleaning of glass and framing, and reinstallation using approved primer and structuralsilicone sealant systems. Adhesion testing will be performed per ASTM C1521. Scope also includes removal and off-site disposal of approximately 9,900 linear feet of asbestos- and PCB-containing glazing compounds associated with 3,450 glass panes. Question Deadline 09/26/2025 at 2:00 PM ET All RequestsforInformation ("RFI") questions are to be posted online. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. Bid Security: Provide a copy of a Bid Bond made out in the penalsum of ten percent (10%) of the Total Bid Amount. In lieu of a Bid Bond, a Certified Check in the amount of ten percent (10%) of the Total Bid Amount is acceptable. A Bid Bond is only required for any Total Bid Amount over $50,000.00. A Total Bid Amount of $50,000.00 or less does not require a Bid Bond. o Anticipated Contract Issuance/Notice to Proceed: November 14, 2025 o Construction is planned to start: November 17, 2025 SET-ASIDE REQUIREMENTS: The Set-Aside Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. LIQUIDATED DAMAGES: Liquidated Damages of Five Hundred Dollars and 00/100 ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time. PRE-BID CONFERENCE: During the Pre-Bid Conference,the ITB and Scope of Work will be discussed. There also will be an opportunity to view existing conditions (if applicable). The Pre-Bid Conference is not mandatory, however, interested Bidders are strongly encouraged to attend. a. Bid Due date is changed from 10/7/2025 to 10/14/2025 b. Scope Review Meeting is changed from 10/10/2025 to 10/16/2025 c. Project duration is changed from 12 weeks to 7 months

Bid Results

Educational

$472,000.00

Public - State/Provincial

Renovation

3

4

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
719
Active Projects
280
Bidding Soon
5,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 17, 2025

Project location map

75 N Eagleville Rd, Storrs Mansfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.