Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2025 at 8:00 PM
Updated September 21, 2025
Renovation of a military facility in Bodega Bay, California. Completed plans call for the renovation of a 6,825-square-foot military facility.
The contractor shall remove existing floor coverings, prep the floors, and install new flooring in four (4) locations at the Station. Colors shall be chosen by the technical POC. The contractor shall remove approximately 6,825 square feet of existing flooring and replace it with commercial-grade, hardwearing, waterproof grey Luxury Vinyl Plank (LVP), including all necessary trim pieces. Work will be performed in four designated areas at Station Bodega Bay: the Administration Building (3,428 SF), Berthing Building (2,857 SF), Male Wet Room (240 SF), and Female Wet Room (300 SF). Tasks include mobilization, floor preparation, installation, daily cleanup, disposal of removed materials in accordance with environmental regulations, and demobilization. All labor, materials, and equipment will be provided by the contractor, while the government will furnish electricity, parking, and laydown areas. Contractor personnel must carry valid photo identification, and vehicles must be properly registered and insured. Work hours are limited to 7:00 AM to 5:00 PM, Monday through Friday, excluding federal holidays, unless otherwise authorized. As required by FAR 36.204, the estimated magnitude of this project is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2025
October 6, 2025
355 Doran Beach Rd, Bodega Bay, CA
Related To This Project
Bodega Bay, CA
Bid Date: Sep 23 2025
Bodega Bay, CA
Bid Date: Nov 21 2025
Bodega Bay, CA
Bid Date: Sep 12 2025
Bodega Bay, CA
Bid Date: Jan 13 2025
Bodega Bay, CA
Bid Date: Feb 04 2025
Bodega Bay, CA
Bid Date: Oct 01 2024
Bodega Bay, CA
Bid Date: Sep 04 2024
Bodega Bay, CA
Bid Date: Aug 27 2024
Bodega Bay, CA
Bid Date: Feb 23 2024
Bodega Bay, CA
Bid Date: Jan 29 2024
Bodega Bay, CA
Bid Date: Dec 29 2021
Bodega Bay, CA
Bid Date: Apr 07 2023
Bodega Bay, CA
Bid Date: Jan 17 2022
Bodega Bay, CA
Bid Date: Sep 24 2019
Bodega Bay, CA
Bid Date: Oct 20 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
