BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work for a municipal facility in Corpus Christi, Texas. Working plans call for site work for a municipal facility.

As of 9/19/2025, project has been cancelled but will be rebid in the future. The scope will consist of an 8' tall heavy-duty chain-link fence to enhance security to the Asset Management Service Center by providing an additional layer of protection against vandalism, theft, and unauthorized access to the city's valuable assets and improve safety for all department staff within the facility. Additionally, the project involves constructing a controlled access rolling entry gate at the Holly side entrance, a controlled access rolling entry gate at the Ayers/Civitan entrance, and a manual access double swing chain-link gate on the Ayers/ Hygeia entrance, and a monument Identification sign with the city insignia and LED lighting at the Holly Street entrance, for privatization and protection of city owned buildings, equipment, vehicles and facilities. A. Security fencing will encompass approximately 97 Acres project limits. B. The addition of a new monumental identification structure with LED lighting at the Holly Road entrance. 1) Single 3'-0" x 14'-6" x 9'-7" high structure with LED light fixtures at each face, similar to the design of the Lipan entry to City Hall; 2) Landscaping on both sides of this entry to include: a) Dry scaping with Colorado Bull Rock 3'-0" beyond the monument signage foundation in all directions. b) Approximately 1 cubic yard 4"-6" Colorado Bull rock on white fabric. C. The addition of one new motorized access controlled 30'-0" wide x 8'-0" tall rolling entry gate at the Holly Road entrance. D. The addition of one new motorized access controlled 30'-0" wide x 8'-0" tall rolling entry gate at the Ayers/Civitan entrance. E. The addition of one new manual controlled 30'-0" wide x 8'-0" tall double swing entry gates at the Ayers/Hygeia entrance. F. The addition of approximately 8,700 LF new heavy-duty chain-link fencing, HF40 framework galvanized (silver), 3" OD posts at 8'-0" on center with 1-5/8" OD top / bottom rail & 6 gauge galvanized chain-link fabric system with concrete pier footings. The deadline to ask questions is 10/01/2025 4:00 PM CST

Final Planning

Municipal

$1,326,121.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

March 19, 2026

Project location map

2726 Holly Rd, Corpus Christi, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.