Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 3, 2025 at 7:00 PM
Updated November 4, 2025
Renovation of a multi-residential development in Chelsea, Massachusetts. Completed plans call for the renovation of a multi-residential development.
The Project consists of but not limited to: Roof Replacement and Restoration, replace roof, fascia, gutters. Bids are subject to M.G.L. c.149 44A-J & to minimum wage rates as required by M.G.L. c.149 26 to 27H inclusive. Question Deadline 10/06/2025 All bidding Requests for Information (RFIs) shall be submitted online TRADES - NONE General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, Roofing, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the CHELSEA HOUSING AUTHORITY. Note: A bid deposit is not required for Projects advertised under $50,000. The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: The project includes roof replacement at two buildings (Spruce & Orange Streets) and roof restoration at one building (Walnut/6th Street), with carpentry, insulation, sheet metal flashing, gutters, downspouts, and chimney repairs; an additional roof restoration at Walnut/6th Street is included as an Add Alternate. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. C. The Contractor's attention is directed to Article 3.3 of the General Conditions. The site/building and adjacent site/buildings will be occupied during construction unless otherwise noted in the Contract Documents. The Contractor shall take all necessary precautions to ensure the public safety and convenience of the occupants during construction. Whenever work is to be done inside occupied units, the Contractor's superintendent and an Awarding Authority's representative shall conduct a pre-work inspection of each unit to make note of existing conditions in the unit. Special attention should be paid to areas where new work will meet existing conditions. H. The Work must be completed in a continuous uninterrupted operation. The Contractor must use sufficient personnel and adequate equipment to complete all the necessary Work requirements within a minimum period of time. I. In accordance with Articles 3.3.7 and 3.3.8 of the General Conditions and unless specifically authorized in writing by the Awarding Authority, the Work must be conducted between the hours of 7:00 AM and 5:00 PM on Monday through Friday. No work is to be done on holidays, Saturdays or Sundays or days that the Awarding Authority is closed other than for emergencies. J. The Contractor is responsible for the security of partially completed Work until the Final Acceptance of Work by the Awarding Authority. K. Only materials and/or equipment intended and necessary for immediate use shall be brought into the Project area. At the end of each workday and at the completion of each phase of Work, equipment and leftover or unused materials shall be removed from the area. There shall be no storage of materials, tools, and/or equipment within any of the occupied dwelling units. Any storage within unoccupied dwelling units or other space controlled by the Awarding Authority must be authorized in writing by the Awarding Authority. L. Smoking is not permitted on site or in buildings/facilities.
Award
Multi-Residential
$266,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
November 24, 2025
Multiple Locations, Chelsea, MA
Related To This Project
Chelsea, MA
Bid Date: Oct 02 2025
Chelsea, MA
Bid Date: Oct 29 2025
Chelsea, MA
Bid Date: Oct 16 2025
Chelsea, MA
Bid Date: Nov 06 2025
Chelsea, MA
Bid Date: Oct 30 2025
Chelsea, MA
Bid Date: Nov 07 2025
Chelsea, MA
Bid Date: Nov 06 2025
Chelsea, MA
Bid Date: Nov 20 2025
Chelsea, MA
Bid Date: Oct 03 2025
Chelsea, MA
Bid Date: Sep 25 2025
Chelsea, MA
Bid Date: Nov 06 2025
Chelsea, MA
Bid Date: Sep 29 2025
Chelsea, MA
Bid Date: Sep 18 2025
Chelsea, MA
Bid Date: Nov 20 2019
Chelsea, MA
Bid Date: Sep 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
