Published September 17, 2025 at 8:00 PM

Updated October 1, 2025

Site work for a water / sewer project in Labadieville, Louisiana. Completed plans call for site work for a water / sewer project.

Sewer Plant Replacement at Labadieville Middle School The Time of Completion of This Project is of Prime Importance. All of the Work Required Shall Be Completed Within One-hundred Eighty (180) Calendar Days From the Written Notice to Proceed, Subject to Milestone Phase Completion Deadlines Identified in the Project Manual or Written Approved Change Orders. Should the Contractor Neglect, Refuse to Complete the Work, or Obtain Approval From the State Fire Marshal's Office for Occupancy on the Date Above, the Owner Shall Have the Right to Deduct From and Retain Out of Such Moneys Which May Be Due or Which May Become Due and Payable to the Contractor, the Sum as Indicated in Paragraph 10.2 of the Instructions to Bidders Per Calendar Day for Each and Every Day That Such Completion of the Work is Delayed Beyond the Prescribed Dates, as Stipulated Damages and Not as a Penalty. All Bid Packages Shall Be Accompanied With the Following: 1. Bid Security in an Amount Equal to Not Less Than Five Percent (5%) of the Bid Amount. Bid Security Shall Be a Certified Check, Cashier's Check or Bid Bond (Money Orders or Letters of Credit Will Not Be Accepted) Made Payable to the Assumption Parish School Board. Bid Bond Shall Be Accompanied With Power of Attorney. 2. Completed Louisiana Uniform Public Works Bid Form as Described in La R.s. 38:2212(B)(2). 3. If Someone Other Than a Corporate Officer Signs for the Bidder/contractor, a Copy of a Corporate Resolution or Other Signature Authorization Shall Be Required for Submission of Bid. Failure to Include a Copy of the Appropriate Signature Authorization, if Required, May Result in the Rejection of the Bid Unless Bidder Has Complied With La R.s. 38:2212(B)(5). Failure to Include Any Item Specified Above, or Failure to Complete the Louisiana Uniform Public Works Bid Form in Its Entirety and Properly Execute This Form Will Result in the Bid / Bids Being Declared Irregular and Cause for Rejection as Being Non-responsive. All Other Information Contained in the Instructions to Bidders, Articles 1-11 Shall Be Strictly Adhered to. Bids Shall Be Accepted Only From Contractors Who Are Licensed Under La. R.s. 37:2150 2164 for the Classification of Mechanical or Municipal and Public Works Construction. No Bid May Be Withdrawn After the Closing Time for Receipt of Bids for at Least Forty-five (45) Calendar Days, Except Under the Provision of La. R.s. 38:2214. The Lowest Qualified Bid Will Be the One Determined to Offer the Best Advantage to the Assumption Parish School Board. the Assumption Parish School Board, to the Extent Permitted by State and Federal Laws and Regulations, Reserves the Right to Reject Any or All Bids/proposals for Just Cause. Proposal Prices Shall Specifically Exclude Any and All Taxes Whatsoever. Act 1029 of 1991 Exempts Local Governments From State and Local Tax Effective September 1, 1991.

Post-Bid

Water / Sewer

$700,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
120
Bidding Soon
939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

December 1, 2025

Project location map

2747 LA-1, Labadieville, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.