Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Site work for a civil project in Bellvue, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000398899 The City of Greeley, Colorado is requesting sealed bids for the repair of a concrete effluent channel at the Bellvue Water Treatment plant at 4505 Filter Plant Rd Bellvue, CO 80512. The scope of services shall include repair coating system application to approximately 2,000 square feet of concrete and steel deck surfaces of the Bellvue Water Filter Plant effluent channel. Repair of the concrete channel will consist of surface preparation and cleaning, trowel on product application, sprayed topcoat product application, and final cleanup of the work area. Product specifications and application requirements can be found in the Method of Procedures (MOP) in exhibit A. Contractor will be responsible for maintaining environmental conditions as required in the specified product data. Work outside of the outlined MOP is expected and the City's desire is to bill this work on a time and materials basis. This work may include, but is not limited to, grout repair of concrete, existing anchor removal and patching, miscellaneous repairs as directed by the City Question Deadline 10/06/2025 at 4:00 PM MT Questions are submitted online No, Questions pertaining to the project may be directed to Dan Nelson, email: purchasing@greeleygov.com or at 970-336-4141. Each bid shall be accompanied, by a certified check drawn on a bank which is insured by the Federal Deposit Insurance corporation or a bidder's bond executed by a surety company authorized to do business in Colorado, made payable to the City of Greeley, Colorado, in an amount not less than five percent (5%) of the proposal sum as security that the successful bidder will enter into a contract to construct this project in accordance with the plans and specifications, and give bonds in the sum as hereafter provided. Checks accompanying bids not accepted will be returned. The successful responsive and responsible bidder will be required to furnish a satisfactory performance bond and payment bond in the amount of the contract sum. The contractor must be able to complete construction during planned shutdown window anticipated to be April 1st 2026 to May 30th 2026. The time frame may be adjusted at the discretion of the City in discussion with the contractor to meet operational constraints and demands. No bid shall be withdrawn after the opening on the bids without the consent of the City of Greeley, Colorado, for a period of sixty (60) days after the scheduled time of the receiving the bids. The City of Greeley retains the right to reject any and all bids and to waive any informality as deemed in the best interest of the city.
Bid Results
Water / Sewer
$100,222.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2025
April 1, 2026
4505 Filter Plant Rd, Bellvue, CO
Related To This Project
Bellvue, CO
Bid Date: Oct 16 2025
Bellvue, CO
Bid Date: Dec 11 2025
Bellvue, CO
Bid Date: Apr 16 2026
Bellvue, CO
Bid Date: Feb 05 2026
Bellvue, CO
Bid Date: Feb 27 2026
Bellvue, CO
Bid Date: Apr 09 2026
Bellvue, CO
Bid Date: Sep 30 2025
Bellvue, CO
Bid Date: Aug 08 2025
Bellvue, CO
Bid Date: Dec 04 2025
Bellvue, CO
Bid Date: Jun 26 2025
Bellvue, CO
--
Bellvue, CO
Bid Date: Feb 04 2025
Bellvue, CO
Bid Date: Dec 14 2021
Bellvue, CO
Bid Date: Dec 14 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
