BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Saratoga Springs, New York. Conceptual plans call for the construction of a playground / park / athletic field; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project work includes removal of approximately 82 trees of varying diameter. New work includes a new parking lot with EV charging stations to the south of the Lincoln Bathhouse, a new parking lot on the northwest side of the Lincoln Bathhouse, expanded parking for the Washington Bathhouse, and expanded parking to the west of the Lincoln Bathhouse to accommodate the Regional Maintenance Shop. A total of 5 EV charging stations (10 EV charging ports) are proposed. Proposed work also includes new walking paths and sidewalks to better connect the new parking lots as well as pedestrian connections from Route 9 to the Lincoln Bathhouse and into the main park. There will also be a new vehicular entrance off the Avenue of the Pines to reduce conflicts between the maintenance entrance and the patron entrance. A new connector road will be constructed between the front of the Lincoln Bathhouse and the Washington Bathhouse to eliminate vehicular and pedestrian conflicts. New landscaping, site lighting and orientation signage will be installed throughout the area as well.. Stormwater from the new entrance road and parking lot will be directed to new dry wells by means of swales and catch basins. Many of the trees to be removed are non-native. This includes Norway maples and Norway spruce. Nineteen red pines along the Avenue of the Pines will also be removed. As of September 22, 2025, this project is in the conceptual phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Playgrounds / Parks / Athletic Fields

$5,000,000.00

Public - State/Provincial

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
157
Bidding Soon
1,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

65 S Broadway, Saratoga Springs, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.