Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 21, 2025 at 8:00 PM
Updated October 22, 2025
Site work for a mixed-use development in Contrecoeur, Quebec. Completed plans call for site work for a municipal facility; and municipal facility.
Reference number: 20095161 Deadline for receipt of complaints 2025-09-29 Redevelopment and Drainage Écocentre Nord Scope: Excavation and replacement of unstable foundation (approx. 1325 m2) Construction of concrete slabs (approx. 180 m2) Installation of ~120 prefabricated concrete blocks Cleaning and regrading of existing ditches (approx. 350 linear meters) Drainage improvements including a new catch basin and piping Delivery schedule The MRC plans to award the contract at its meeting on October 9 and would like work to begin on October 20, 2025. The contractor will be given 30 calendar days to complete the work. In the event that weather conditions prevent the contractor from carrying out certain work, it may be postponed until spring 2026 with the prior agreement of the MRC. No price increases will be accepted for work postponed to 2026. Between the date the contract is awarded and the date set by the Contractor to begin the work, the Contractor must send the Project Owner all shop drawings, the list of subcontractors, signage plans, detour and bypass plans, and the legal documents required by the contract. It is understood that the date of completion of the work is the date on which the Supervising Engineer is invited by the Contractor to carry out the final inspection of the work for provisional acceptance and that all deficiencies noted by the Supervising Engineer during the previous inspection, if any, have been corrected. All costs associated with the basic constraints listed above must be included and broken down in the various items of the tender price schedule. Those interested can obtain the tender documents on the electronic tendering SÉAO at www.seao.ca or toll free at 1-866-669-7326.
Award
Water / Sewer
$227,070.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2025
October 20, 2025
4111 Rte Marie-Victorin, Contrecoeur, QC
Related To This Project
Contrecoeur, QC
Bid Date: Oct 06 2025
Contrecoeur, QC
Bid Date: Jun 18 2025
Contrecoeur, QC
Bid Date: Apr 17 2025
Contrecoeur, QC
Bid Date: Aug 05 2021
Contrecoeur, QC
--
Contrecoeur, QC
--
Contrecoeur, QC
--
Contrecoeur, QC
Bid Date: Aug 08 2024
Contrecoeur, QC
Bid Date: Jul 25 2024
Contrecoeur, QC
Bid Date: Jul 11 2024
Contrecoeur, QC
--
Contrecoeur, QC
Bid Date: Nov 15 2023
Contrecoeur, QC
Bid Date: Mar 21 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
