BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and paving for a civil project in Highland Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

As of November 18 30, 2025 Project has not been awarded . Award will be on November 21, 2025 1. Bridge Pier Rehabilitation: Concrete pier encasement (4 piers), concrete patch repair at location(s) identified on plans and epoxy crack repair at location(s) identified on plans. 2. Removal of existing decorative bridge wall cap (EIFS material) and replacement with anchored, precast concrete decorative bridge wall cap. 3. Asphalt milling, asphalt overlay and striping of bridge deck and approaches. 4. Chemical grouting of voids at identified locations at the bridge approach slabs. 5. Cleaning and coating of bridge surfaces, abutment cap, bridge railing and existing utility pipes as indicated on the plans and in the Measurement & Payment item. 6. Removal and reinstallation of existing guardrail (if necessary) to complete the rehabilitation work. 7. Maintenance of Traffic and coordination with the Owner and Engineer during construction. 8. Environmental Protections: a. Contractor is responsible for coordinating and meeting all NPDES and FDEP permit conditions and regulations specifically and including protection of water quality. This includes prohibition of runoff of deleterious material resulting from surface preparation, paint splatter, concrete work, paving, milling, and overlay, etc. and all pollutants resulting from construction activities from being introduced into the waterway during any and all phases of work. b. Contractor is responsible for submitting for an NPDES Notice of Intent (NOI) and Notice of Termination (NOT) as required for construction of the project. 9. Restoration: a. Existing landscaping and other improvements shall be protected during construction. Sod that is damaged during construction shall be replaced at the contractor's expense. All restoration shall be at the contractor's expense. All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the Blank Staff or Officials Other Than the Specified Contact Person. M/WBE's are encouraged to participate in the bid process. Question Deadline 10/10/2025

Award

Bridges / Tunnels

$550,191.00

Public - City

Paving, Site Work

12

3

16

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
123
Bidding Soon
1,852
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 21, 2025

Project location map

Bel Lido Dr, Highland Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.