Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 26, 2025 at 7:00 PM
Updated November 27, 2025
Site work and paving for a civil project in Highland Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
As of November 18 30, 2025 Project has not been awarded . Award will be on November 21, 2025 1. Bridge Pier Rehabilitation: Concrete pier encasement (4 piers), concrete patch repair at location(s) identified on plans and epoxy crack repair at location(s) identified on plans. 2. Removal of existing decorative bridge wall cap (EIFS material) and replacement with anchored, precast concrete decorative bridge wall cap. 3. Asphalt milling, asphalt overlay and striping of bridge deck and approaches. 4. Chemical grouting of voids at identified locations at the bridge approach slabs. 5. Cleaning and coating of bridge surfaces, abutment cap, bridge railing and existing utility pipes as indicated on the plans and in the Measurement & Payment item. 6. Removal and reinstallation of existing guardrail (if necessary) to complete the rehabilitation work. 7. Maintenance of Traffic and coordination with the Owner and Engineer during construction. 8. Environmental Protections: a. Contractor is responsible for coordinating and meeting all NPDES and FDEP permit conditions and regulations specifically and including protection of water quality. This includes prohibition of runoff of deleterious material resulting from surface preparation, paint splatter, concrete work, paving, milling, and overlay, etc. and all pollutants resulting from construction activities from being introduced into the waterway during any and all phases of work. b. Contractor is responsible for submitting for an NPDES Notice of Intent (NOI) and Notice of Termination (NOT) as required for construction of the project. 9. Restoration: a. Existing landscaping and other improvements shall be protected during construction. Sod that is damaged during construction shall be replaced at the contractor's expense. All restoration shall be at the contractor's expense. All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the Blank Staff or Officials Other Than the Specified Contact Person. M/WBE's are encouraged to participate in the bid process. Question Deadline 10/10/2025
Award
Bridges / Tunnels
$550,191.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
November 21, 2025
Bel Lido Dr, Highland Beach, FL
Related To This Project
Highland Beach, FL
Bid Date: Jun 18 2025
Highland Beach, FL
Bid Date: Feb 25 2025
Highland Beach, FL
--
Highland Beach, FL
Bid Date: Nov 18 2025
Highland Beach, FL
Bid Date: Mar 25 2022
Highland Beach, FL
Bid Date: Aug 28 2023
Highland Beach, FL
Bid Date: Apr 27 2023
Highland Beach, FL
Bid Date: Mar 06 2023
Highland Beach, FL
Bid Date: May 23 2022
Highland Beach, FL
Bid Date: Nov 14 2022
Highland Beach, FL
Bid Date: Oct 17 2022
West Palm Beach, FL
Bid Date: Sep 19 2025
Jacksonville, FL
Bid Date: Dec 16 2025
Pace, FL
Bid Date: Oct 15 2025
Crestview, FL
Bid Date: Oct 27 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
