Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2025 at 8:00 PM

Updated October 9, 2025

Renovation of a municipal facility in Albany, New York. Completed plans call for the renovation of a municipal facility.

General Construction Work Contracts Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e., certified check, bank check, or bid bond in the amount of $25,000).All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount the Anticipated Annual Value of Work as noted in Table A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform a series of individual repair, alteration, modernization, maintenance, rehabilitation, demolition, and construction projects at different locations. Work is accomplished by means of issuance of a Job Order against amaster contract. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the Work. All bidders are expected to cooperate in implementing this policy. OGS hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises ("MBE") participation and 15% for Women- Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs). The work consists of the following improvements: Terminal Completion: Interior fit-out of 140,000 SF terminal building, including interior framing, MEP, and finish work. Also includes completion of the apron level construction, including masonry, framing, basic finishes, MEP systems and minor structural modifications. Terminal completion also includes installation of exterior facade finishes comprised primarily of Exterior Insulation and Finish Systems. Central Utility Plant: Includes installation of all equipment, piping, electrical and HVAC work necessary to complete the utility plant. Work also includes the installation of hydronic piping between the utility plant and other airport buildings.

Post-Bid

Municipal

$1,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

171

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
429
Active Projects
181
Bidding Soon
2,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 7, 2025

Project location map

Multiple Locations, Albany, NY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed