Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work and paving for a bridge / tunnel in Cuba City, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Solicitation Id: SW-06 The structures need treatment to extend their service lives. Bridge preventative perpetuation project on seven (7) bridges on the USH 151 corridor. Construction project 1202-00-65 will consist of replacing the expansion joints on B-22-197 and B-22-198. Construction project 1202-00-66 will have primary work of placing Methyl Methacrylate (MMA) flood seals on B-25-123, B-25- 125, B-25-129, B-33-95, B-33-97 along with various secondary work for structures including applying pigmented surface sealer to parapets, strapping three wings on one structure, replacing two wings on one structure, adding riprap to restore areas of undermining to one structure along with other secondary work. Anticipated Construction Cost: $2,000,000-$2,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 03/01/2026 Anticipated Project Completion Date: 06/01/2031 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Dubuque - Dodgeville - USH 151N *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Bridges / Tunnels
$2,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2026
US-151, Cuba City, WI
Related To This Project
Cuba City, WI
--
Cuba City, WI
Bid Date: Aug 25 2025
Cuba City, WI
Bid Date: May 13 2025
Cuba City, WI
Bid Date: Apr 01 2025
Cuba City, WI
Bid Date: Oct 17 2024
Cuba City, WI
Bid Date: Sep 17 2024
Cuba City, WI
Bid Date: Jul 16 2024
Cuba City, WI
Bid Date: Dec 10 2024
Cuba City, WI
--
Cuba City, WI
Bid Date: Jan 14 2025
Cuba City, WI
Bid Date: May 31 2024
Cuba City, WI
Bid Date: Apr 29 2024
Cuba City, WI
Bid Date: Apr 29 2024
Cuba City, WI
Bid Date: Apr 11 2024
Cuba City, WI
Bid Date: Mar 08 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
