Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a civil project in Pana, Illinois. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
As of May 1, 2026, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. City/County Christian Project consists of improving the vertical roadway alignment, installing a precast culvert extension with cast in place collar, hot-mix asphalt surface and other collateral work. Partial list of quantities: Earth Excavation (45 Cu Yd), Furnished Excavation (712 Cu Yd), Aggregate Base Course, Type A 8" (284 Ton), Pipe Culverts, CL A, Type 1 Equivalent Round Size 36" (8 Ft), Precast Reinforced Concrete End Sections, Eq. Round Size 36" (1 Each), Box Culvert to be Cleaned (38 Foot), Concrete Structures (0.6 Cu Yd), Bituminous Materials (Tack Coat) (239 Pound), Hot-Mix Asphalt Surface Course, IL-9.5, Mix "c", N50 (132 Ton), Seeding, Class 2 (Special) (0.25 Acre), Regulated Substances Monitor (1 Cal Day), Regulated Substances Final Construction Report (1 L Sum), Railroad Protective Liability Insurance (1 L Sum) Project Location: Located on TR 254 (2100 East Road) approximately 1.0 miles East of Rosamond, IL Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Project Consists of Improving the Vertical Roadway Alignment, Installing a Precast Culvert Extension
Final Planning
Roads / Highways
$231,098.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
November 1, 2026
N 2100 East Rd, Pana, IL
Related To This Project
Pana, IL
Bid Date: Oct 03 2025
Pana, IL
Bid Date: Oct 13 2025
Pana, IL
Bid Date: Dec 31 2025
Pana, IL
Bid Date: Jan 16 2026
Pana, IL
Bid Date: Feb 27 2026
Pana, IL
Bid Date: Feb 04 2026
Pana, IL
Bid Date: Feb 27 2026
Pana, IL
Bid Date: Mar 02 2026
Pana, IL
Bid Date: Oct 08 2025
Pana, IL
Bid Date: Sep 25 2025
Pana, IL
Bid Date: Sep 15 2025
Pana, IL
Bid Date: Oct 08 2025
Pana, IL
Bid Date: Jul 21 2025
Pana, IL
Bid Date: Apr 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
