Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Renovation of a water / sewer project in Dallas, Texas. Completed plans call for the renovation of a water / sewer project.

Estimate: $35M to $40M The project scope includes, but is not limited to, the following major work items: Replacement of Transformers AA and BB at Pump Station No. 6A. Replacement of Transformers GG and HH at Pump Station No. 7A. Replacement of transformers M, E, G, and XF-11. Replacement of Five (5) Variable Frequency Drives (VFDs) at Pump Station 13B. Addition of a Generator at an On-Site Storage Basin Peak Flow Structure. Demolition of Transformers TRN-U, Sub-F, and Sub-P. Replacement of Actuators in Aeration Basins Nos. 1-12 Lighting Improvements (LED lighting conversions) Question Deadline 10/24/2025 at 11:00 PM CT Online portal. Guard Booth water and sewer service improvements. Pump Station Nos. 13A and 13B Yard Piping Improvements. Pump Station No. 23 Piping Improvements. Replacement of Final Clarifiers Nos. 9 and 10 Hose Station Waterline. Rehabilitation of Suction Piping in Pump Station No. 6A and Valve Relocation in Pump Station No. 6. Rehabilitation of Scum Collection on Primary Clarifiers Nos. 1-4. Rehabilitation of Valve Vault 1E and Meter Vault 1A. Construction of Valve Vault 1F. Replacement of Blowers Nos. 1 and 5 at Blower Building No. 1. additional pre bid meeting note: Anyone wanting to attend the Pre-Bid Conference must give 24 hours prior notice to Soon Wong, wongsm@trinityra.org, 469-858-8333 cell, providing name, company representing, purpose (Pre-Bid Conference), and time of arrival. Question Deadline 10/23/2025 2:00:00 PM CST DIRECT ALL QUESTIONS REGARDING DISTRIBUTION OR DESIGN of Contract Documents for this Project through online portal. Only responses issued via Addenda are binding. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construct work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the project completely operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation and all other work required for a complete and operable project. 4. Test and place the completed project in operation. 5. Install Owner provided products and place in operation. 6. Drawings and specifications do not indicate or describe all of the work required to complete the project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Engineer. Completion- 1,005 calendar days The deadline to ask questions is 10/24/2025 11:00 PM CST Online portal. DG-22-10280.2

Bid Results

Water / Sewer

$51,285,450.00

Public - State/Provincial

Renovation

286

44

74

8

Subscribe For Documents

168 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
44
Bidding Soon
3,969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.