BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 13, 2026 at 7:00 PM

Updated January 21, 2026

This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.

The work to be performed under this Contract consists of furnishing all tools, equipment, materials, supplies, and manufactured articles; furnishing all labor, transportation, and services, including fuel, power, water, and essential communications; and performing all work or other operations required for the fulfilment of the Contract, in strict accordance with the Contract Documents. Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Work site: Various King County facilities located throughout Washington, primarily for the Wastewater Treatment Division. The work performed under this Contract shall not exceed $4,000,000 and the initial Contract Time shall not exceed 365 calendar days from the date of Contract Execution by the County. The County does not guarantee any minimum amount of work or that the dollar amount of the Work Orders issued will total $4,000,000 during the duration of this Contract. At the County's sole discretion, this Contract may be extended by Contract Modification for an additional 365 calendar days or until the Not to Exceed Contract Price is reached, whichever occurs first. The County shall review all Work Orders issued under this Contract with an estimated value equal to or greater than $150,000 to establish a specific required or aspirational level of participation by Certified Firms, Apprentices and or Priority Workers. Pre-Bid Conference: A pre-bid conference is not scheduled. Subcontracting Opportunities: Mechanical, Mechanical Equipment & Materials. Apprenticeship Requirements: 15% minimum Apprentice Utilization Requirement of the total labor hours worked during the contract. SCS Utilization Requirements. 5% minimum requirement for King County Certified Small Contractors and Suppliers (SCS) for the total price of all executed Work Orders. Bid Guaranty: Not less than five percent (5%) of the Total Bid Price. This information is available in alternate formats for individuals with disabilities upon advance request by calling 206-263-9400, TTY Relay: 711.

Post-Bid

Water / Sewer

$4,000,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

26

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
106
Bidding Soon
1,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

March 23, 2026

Project location map

Multiple Locations, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.