Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Renovation of a power facility in Hastings, Nebraska. Completed plans call for the renovation of a power facility.
Cooling Tower MCC Room HVAC Upgrades at Whelan Energy Center, Unit 2, Public Power Generation Agency, Hastings, Nebraska. Each proposal shall be accompanied by a cashier's check, certified check on a solvent U.S. commercial bank, or a bid bond in an amount of not less than five percent (5%) of the total bid. Such check or bid bond shall be contained in a separate envelope attached to bidder's proposal. All proposal and bid bonds shall have original signatures. The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. The PPGA reserves the right to accept the bid which best suits its needs whether the price is the lowest or not, to reject any or all bids, and to waive any informalities. General. PPGA is accepting bids for the Cooling Tower MCC Room HVAC upgrade work at Whelan Energy Center, 4520 East South Street in Hastings, Nebraska. The Bidder is highly encouraged to visit the site prior to submitting a bid. The Bidder shall inform their self of all conditions and factors which would affect the execution of the work. No claims for financial compensation or time extension, based on the lack of such prior information (or its effect on the cost of the work) will be permitted by the Owner. Please contact Derek Pfeifer, Production Engineer, at 402-462-3673 if you have any questions about this project or would like to arrange a site visit. 3.002 Project Schedule. This project can be started anytime after award, but must be completed by May 1 st , 2026. Scope. The Contractor shall provide all labor, tools, equipment, materials, and freight necessary to complete the mechanical scope of work, as shown on the drawings and specifications, in the allotted time frame. Additionally, the contractor shall: o Install Owner supplied Air Conditioning Unit and Remote operation box o Install foundation and supporting structural steel o Alter east wall of building to permit duct work installation o Provide all wiring for power, incidental control wiring, and instrumentation wiring, including: o All 480VAC and 120VAC work, including installation and relocation as shown on the drawings o Install new duct smoke detector and coordinate with fire alarm system company o 24VDC control conduits and wiring between A/C Unit, Remote Panel, and DCS o Remove and replace existing conduits, disconnects, junction boxes, and wires as specified o Conduits as necessary for mechanical contractor's incidental control wiring o Install fans o Submittals and other requirements as required by HVAC technical specifications If questions arise during the bidding process regarding the meaning of any portion of the contract documents, the prospective bidder shall submit the questions to the Engineerfor clarification. B. Any definitive interpretation or clarification of the contract documents will be published by addenda, properly issued to each person holding documents, prior to the bid date. C. Verbal interpretation or explanation not issued in the form of an addendum shall not be considered part of the bidding documents. D. When submitting questions for clarification, adequate time for issuance and delivery of addenda must be allowed. E. The Engineershall be the sole judge regarding interpretations of conflicts within contract documents.
Award
Power Plant
$64,680.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
November 17, 2025
100 S Pawnee Ave, Hastings, NE
Related To This Project
Hastings, NE
Bid Date: Dec 18 2025
Hastings, NE
Bid Date: Oct 15 2025
Hastings, NE
Bid Date: Oct 15 2025
Hastings, NE
--
Hastings, NE
--
Hastings, NE
Bid Date: Nov 14 2025
Hastings, NE
Bid Date: Dec 12 2025
Hastings, NE
Bid Date: Dec 12 2025
Hastings, NE
Bid Date: Oct 08 2025
Hastings, NE
Bid Date: Oct 01 2025
Hastings, NE
Bid Date: Oct 01 2025
Hastings, NE
Bid Date: Oct 15 2025
Hastings, NE
Bid Date: Sep 30 2025
Hastings, NE
Bid Date: Sep 18 2025
Hastings, NE
Bid Date: Sep 17 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
