Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Renovation of a mixed-use development in Lawrence Township, New Jersey. Completed plans call for the renovation of a educational facility.

Contract Award Pending Board Meeting on 11/13/25 Myron L. Powell School 2025 Partial Window Replacement Bids must be accompanied by a certified check, bank cashier's check, treasurer's check or Bid Bond in the form provided in the Contract Documents, with corporate surety satisfactory to the Owner, in an amount of 10% of the Base Bid, but in no case in excess of $20,000.00 Tuesday 10/14/25 Deadline for Questions to Garrison Architects at 5:00 P.M. (send questions to jminniti@garrisonarch.com) The right is reserved to reject all bids pursuant to N.J.S.A. 18A:18A-22 or to waive minor informalities, defects, and non-material exceptions The Project consists of Windows Replacement at Myron L. Powell School, 225 Main Street, Cedarville, New Jersey 08311. a. The Project includes window replacement throughout the building as shown on the construction documents. New window systems shall be fixed over projected units and each window shall have a new shade installed as detailed in the construction documents. All existing louvers, and pipe penetrations through existing window panels are to be removed, salvaged and reinstalled in new window assemblies. The scope also includes the scraping and painting of the existing lintels at each opening and security screens where shown in the construction documents. Refer to the construction drawings and specifications for a complete scope of work. b. All work to be performed in a classroom to classroom manner. Remove and dispose of existing windows including sash, frame, trim and other related products. Remove existing through-window mechanical louvers, piping & conduit and salvage for reinstallation. Clean area of all dirt and dust. c. Install all components of new window system in a professional manner, including subframe, panning, trim and shades inside and outside enclosures, ceiling tile supports and windows. Completely seal exterior perimeter of new windows as indicated on the drawings. d. See the Asbestos Abatement Work Plan prepared by TTI Environmental, Inc. for the abatement work that is included in this project.

Award

Educational

$845,261.00

Public - City

Renovation

9

15

6

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
251
Bidding Soon
3,535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2025

June 22, 2026

Project location map

225 Main St, Lawrence Township, NJ

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed