Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Renovation of a playground / park / athletic field in New York, New York. Working plans call for the renovation of a playground / park / athletic field.

This project will reconstruct a prefabricated public restroom building in Gateway Estates Park. The average time for design is 9-14 months. The design timeline for this specific contract will be established once the project scope is determined. The average time for procurement is 9-12 months. The procurement timeline for this specific contract will be established at the conclusion of the design phase. The average time for construction is 12-18 months. The construction timeline for this specific contract will be established at the conclusion of the procurement phase. Total Funding: Less than $1 million The method of Contractor Selection has not been Determined at this time.

Final Planning

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
977
Active Projects
501
Bidding Soon
7,485
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.