BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Renovation of a mixed-use development in Riverdale, New Jersey. Completed plans call for the renovation of a educational facility.

UV Replacements at Riverdale Public School Location: 52 Newark Pompton Turnpike, Riverdale NJ 07457 Scope consists of the replacement of existing unit ventilators and local controls, and installation of a new rooftop unit with all required connections. Bid(10.0%), Performance(100.0%), Payment(100.0%), Maintenance(100%), Certified Check A. The Contract Documents are prepared in accordance with available information as to existing conditions and locations. +If, during construction, conditions are revealed at variance with the Contract Documents, notify the Architect immediately so that supplementary instructions may be issued. B. The Specifications determine the kinds and methods of installation of the various materials, the Drawings establish the quantities, dimensions and details of materials, the schedules on the Drawings give the location, type and extent of the materials. C. Should the Drawings, Specifications or schedules disagree in themselves or with either or both of the others, the better quality or greater quantity of work or materials shall be performed and provided, unless otherwise directed in writing by the Architect. D. Dimensions given on the Drawings govern scale measurements and large scale drawings govern small scale drawings, except as to anything omitted unless such omission is expressly noted on the larger scale drawings. E. The techniques or methods of specifying to record requirements varies throughout text, and may include "prescriptive", "open generic/descriptive", "compliance with standards", "performance", "proprietary", or a combination of these. +The method used for specifying one unit of work has no bearing on requirements for another unit of work. F. Whenever a material, article or piece of equipment is referred to in the singular number in the Contract Documents, it shall be the same as referring to it in the plural. +As many such materials, articles or pieces of equipment shall be provided as are required to complete the work. G. With the approval of the Architect and without additional cost to the Owner, the Contractor shall make all necessary changes or modifications to locations as may be necessary to suit requirements and conditions at the building and for the proper and conveniently accessible location of all parts of the system. H. Small details not usually shown or specified, but necessary for the proper installation and operation of the work, shall be provided. I. Cap all incomplete lines, ducts, conduits, openings, etc., until ready for final connection, after which they shall be thoroughly cleaned and left unobstructed. DESCRIPTION OF ALTERATIONS WORK A. Scope of demolition and removal work is shown on drawings and specified in Section 02 41 00 B. HVAC: +Alter existing system and add new construction, keeping existing in operation C. Electrical Power and Lighting: +Alter existing system and add new construction, keeping existing in operation. D. The new work generally consists of the replacement of existing unit ventilators and local controls, and installation of a new rooftop unit with all required connections. E. The scope of the work shall not be limited to what is specifically called out on the drawings or specifications, but shall include any and all selective demolition as well as any cutting and patching as may be required to accomplish the intended construction. On site work is expected to begin on or before June 23rd 2026. Agree to be Substantially Complete with the Work by August 21st, 2026. Agree to fully Complete, allowing the Owner to reclaim use of the space, by August 28th, 2026. Question Deadline 09/30/2025 at 2:00 PM ET directly through the BidBox portal . inquiries should be directed to Solutions Architecture directly through the BidBox portal. Please log in to your BidBox account and in the Bidder Dashboard select "Submit RFI" under the corresponding project. DO NOT send RFI's to bidding@solutions-arch.com or the info@solutions-arch.com inbox as they will not be responded to.

Post-Bid

Educational

$800,000.00

Public - City

Renovation

25

16

2

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
850
Active Projects
225
Bidding Soon
7,256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2025

June 23, 2026

Project location map

52 Newark Pompton Turnpike, Riverdale, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.