BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Renovation of an educational facility in Columbia, Missouri. Completed plans call for the renovation of a educational facility.

**As of October 22nd, 2025, this project has not yet been awarded. The project is expected to be awarded November 11th, 2025.** Mill Creek Elementary Building Automation System Upgrade Award of this bid is planned for November 10, 2025. For inquiries or questions about the bid or specifications, please contact the following: 1. Bid procedures and format - Ms. Lisa Ozanich, Assistant Purchasing Agent Email: lozanich@cpsk12.org All questions or requests shall be submitted in writing/email prior to the bid closing. Replies may be issued by addendum Scope of Work Contractor shall provide engineering, installation, programming, startup, graphics, and warranty for the following system components. All controllers must be Automated Logic and installed by certified labor. Substitutions will not be accepted. Reuse of existing wiring and devices is required where operational. Head End and Network: 1. Install one (1) Automated Logic G5CE controller in existing control panel. 2. Replace (4) existing AARs and install (1) additional AAR for network segmentation. 3. Replace 24V transformer; reuse existing 120V power. 4. Reuse existing ARCnet wiring. Chilled Water System: 1. Replace legacy controller in existing panel. 2. Replace 24V transformer; reuse 120V power. 3. Install new AMR; wire to existing points and reuse valves/sensors. 4. Provide new temperature sensors and updated programming and graphics. Hot Water System: 1. Replace legacy controller with the new model. 2. Replace transformer in existing panel. 3. Install new AMR; reuse existing control points, valves, safeties. 4. Provide and wire new temperature sensors. 5. Provide updated programming and graphics. AHU 1,2,3,4,5,7,8 / RTU-1 / MAU-1: 1. Replace existing DDC controller with the newest model. 2. Replace 24V transformer in all units excluding RTU 1. 3. Reuse wiring to control valves, actuators, safeties, DP and sensors. 4. Provide and wire new temperature sensors, utilize existing wire. 5. Install new temperature, CO2/humidity, zone sensors. 6. Provide and wire new duct and or building pressure sensors. 7. Provide updated programming and graphics. VAVs (31 Total): 1. Replace VAV controllers with the newest model that are equipped with integral actuators. 2. Replace 24V transformers; reuse wiring. 3. Install and wire new supply air sensors. 4. Provide and wire new space sensors with temperature, and CO2/humidity sensing in existing locations. 5. Provide updated programming and graphics. FTUs (33 Total): 1. Replace FTU controllers with the newest model that are equipped with integral actuators. 2. Provide and wire new space sensors with temperature, and CO2/humidity sensing in existing locations. 3. Replace 24V transformers; reuse all wiring. 4. Install new supply air sensors, reuse existing wire. 5. Provide updated programming and graphics. Kitchen Split System: 1. Replace existing controller with the newest model. 2. Replace existing transformer in panel, reuse existing wire. 3. Reuse wiring for fan, compressor, and heat start/stop. 4. Wire to existing DX and fan status. 5. Control existing damper actuators, utilize existing wire. 6. Install new space and air temperature sensors. 7. Provide updated programming and graphics. Domestic Hot Water System: 1. Replace old controller with the newest model and disconnect the abandoned controls. 2. Replace 24V transformer and reuse the existing wire. 3. Reuse existing pump and heater start/stop relays and CT. 4. Provide and Install new water temperature sensors and provide updated programming. Exhaust Fans (5 Total - EF-4, 7, 20, 21, 22): 1. Replace existing controllers with new. 2. Replace 24V transformers and reuse existing wire. 3. Wire and reuse existing fan relays and CTs. 4. Provide updated programming. Exterior Lighting: 1. Provide and Install new controller in electrical closet. 2. Provide ARCnet communications and 24V power to the controller. 3. Install lighting relay to replace existing timer and wire. 4. Program per updated lighting sequence.

Bid Results

Educational

$273,640.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
17
Bidding Soon
474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

November 14, 2025

Project location map

2200 W Nifong Blvd, Columbia, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.