BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 7, 2025

This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.

Faa advisory circular (ac) 150/5100-14e, architectural, engineering and planning consultant services for airport grant projects should be referenced. The contractor shall be available to perform services as needed for both airport and city: O project management O cip/aip projects O airside and landside projects or engineering services O plan checking O general aviation O utility engineering O traffic engineering O renewable energy O gis and zoning O cost benefit analysis (cba) O design/project phase services (cspp) O design survey and geometrics O pavement evaluation and design O environmental permitting O coordination w / other agencies & utilities O value engineering O autocad services O preliminary engineering studies O technical studies & reports O alternatives analysis O rehabilitation strategies O final design ps&es O public bidding and construction phase services O reporting and presentations O scheduling O on-call services Faa federally funded grant requirements Projects performed under this agreement may be funded in whole or in part with federal aviation administration (faa) airport improvement program (aip) grant funds. This project is funded in whole or in part with federal aviation administration (faa) airport improvement program (aip) grant funds. As such, all services and activities performed under this rfp and resulting contract must comply with all applicable federal laws, regulations, executive orders, and faa guidance, including but not limited to 2 cfr part 200, faa advisory circular 150/5100-14e, and 49 u.S.C. Chapter 471. Consultants shall ensure that all lower-tier contractors and subcontractors are also fully compliant with these federal requirements. Failure to comply may result in termination of the agreement and/or repayment of grant funds to the faa. As such, the selected consultant shall comply with all applicable federal laws, regulations, executive orders, and guidance, including but not limited to: City procurement compliance In accordance with 2 cfr 200.318, the city will follow its own documented procurement procedures, which reflect applicable state and local laws and regulations, provided that the procurements conform to applicable federal law and the standards identified in 2 cfr 200.317-200.326. This ensures full compliance with faa and usdot requirements for federally funded airport improvement program (aip) projects. 1. Advisory circular 150/5100-14e compliance O consultant selection, negotiation, and contracting must follow faa ac 150/5100-14e, architectural, engineering, and planning consultant services for airport grant projects (including change 1). O qualifications-based selection (qbs) procedures shall be used in accordance with 49 u.S.C. 47107(e) and 2 cfr 200.317-200.326. O cost proposals shall not be a selection factor but will be subject to negotiation after qualifications-based selection. 2. Grant assurances and federal provisions The consultant shall adhere to all required faa aip grant assurances, including but not limited to: O civil rights and title vi of the civil rights act of 1964. O disadvantaged business enterprise (dbe) participation requirements in accordance with 49 cfr part 26. O restrictions on lobbying in accordance with 49 cfr part 20. O compliance with buy american preferences (49 usc 50101). O compliance with davis-bacon act prevailing wage requirements, if applicable. O access to records and audits by the faa, dot, or city for a minimum of three years after project closes out in accordance with 2 cfr 200.334, unless litigation, audit, or other actions involving the records are ongoing, in which case records must be retained until completion of all such actions. The city reserves the right to require a longer retention period (up to 10 years) for internal compliance purposes. 3. Contract clauses All contracts and subcontracts funded under faa aip must include required federal contract provisions in accordance with 2 cfr part 200, appe Project duration 3 years Pre-bid meeting no The method of contractor selection has not been determined at this time.

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
4
Bidding Soon
1,957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.