BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 11, 2026

Site work and outdoor lighting for a civil project in Angus, New Mexico. Completed plans call for site work for a road / highway; water / sewer project; for outdoor lighting for a road / highway; and bridge / tunnel.

TERMINI: NM 48, MP 3.450 to MP 3.510 for 0.060 miles COUNTY: Lincoln (District 2) TYPE OF WORK: Concrete Box Culvert, Drainage Improvements and Lighting Replacing existing corrugated metal pipe (cmp) with concrete box culvert (cbc), new open channel, and drainage improvements, upgrade sidewalks and ramps to Ada standards, add new Ada ramp, minor pavement rehabilitation, minor road obliteration and roadway reconstruction. LICENSES: (GF-2 or GF-98) and (GA-1 or GA-98) and (EE-98) FUNDING TYPE: Federal-aid LISTING THRESHOLD: $5,000 (Subcontractors Fair Practices Act Compliance) WAGE RATE (FEDERAL): NM20260036 As a condition to submitting a Bid all Bidders bidding as Contractors are required to be prequalified with the NMDOT Office of Inspector General seven (7) Days before Bid Opening per 18.27.5 NMAC. All Subcontractors are required to be prequalified before performing any Work and prior to supplying goods or services to the Project. NMDOT - Call 004 - Concrete Box Culvert, Drainage Improvements and Lighting

GC Bidding

Roads / Highways

$6,498,915.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
12
Bidding Soon
222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2026

November 17, 2026

Project location map

NM-48, Angus, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.