BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work and paving for a mixed-use development in San Francisco, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Scope of Work: at various locations in Districts 2, 5, 6, 9 & 10 of San Francisco, California and consists of curb ramp / bulb-out construction, sewer / drainage work, electrical work, traffic control, and all related work. The time allowed for completion is 210 consecutive calendar days. The estimated construction cost is approximately $1,500,000. For more information, contact the Project Manager Anastastia Haddad by phone: (628) 271-2405 or email: Anastastia.Haddad@sfdpw.org. On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations ("DIR"). No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] This Project shall incorporate the required partnering elements for Partnering Level 1. Refer to Section 01 31 33 for more details. Pursuant to San Francisco Administrative Code ("Administrative Code") Section 6.25 and Chapter 25 of the Environment Code, "Clean Construction" is required for the performance of all work. The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items With Unit Prices basis. Progressive payments will be made. The Contract will be awarded to the lowest responsible responsive bidder. A bid may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City. Bid discounts may be applied as per Administrative Code Chapter 14B. LBE Subcontracting Participation Requirement is 20%. In accordance with Administrative Code Chapter 14B requirements, good faith efforts may apply. Refer to Form 2B. For details, contact Norbu Dhonyo by phone at (415) 554-0648 or by email at Norbu.Dhonyo@sfgov.org. For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award. Class "A" license is required to bid. In accordance with Administrative Code Chapter 6, no bid is accepted and no contract in excess of Threshold is awarded by the City and County of San Francisco Department of Public Works until such time as the Mayor approves the contract for award and the Director of Public Works then issues an order of award. Beginning on September 1, 2022, no Bid is accepted and no contract in excess of the Threshold Amount is awarded by the City and County of San Francisco until such time the Director of Public Works recommends the contract for award and the Public Works Commission then adopts a resolution awarding the Contract. Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds. Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with Administrative Code Chapter 12P, Minimum Compensation Ordinance. This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction (''Policy'') as set forth in Administrative Code Section 6.22(g). Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Section 00 73 30 of the Project Manual for more information. Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks after notification of award. If a bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the bidder shall, no later than the 10 th working day prior to the date of Bid opening, provide written notice to the Contract Administration Division, San Francisco Public Works, setting forth with specificity the grounds for the objection. Right reserved to reject any or all bids and waive any minor irregularities.

Post-Bid

Sidewalks / Parking Lot

$1,500,000.00

Public - City

Paving, Site Work

35

19

7

8

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
197
Bidding Soon
2,962
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

December 22, 2025

Project location map

Multiple Locations, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.