BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2026 at 7:00 PM

Updated February 11, 2026

Site work and renovation of a mixed-use development in Red Deer, Alberta. Design plans call for site work for a water / sewer project; and for the renovation of a detention facility.

Red Deer Remand Centre Replacement of Main Building Electrical Infrastructure, Fire Alarm System, Sanitary and Storm Water Piping. TIMELINE: Request for Proposal (RFP) for Prime Consultant Services has been awarded. Tender and construction timelines may be confirmed mid-/late 2026. *Budget is unreleased.

Design

Jails / Prisons

$4,500,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2027

Project location map

4720 49 St, Red Deer, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.