BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2025 at 7:00 PM

Updated December 31, 2025

Renovation of a municipal facility in Washington, District of Columbia. Completed plans call for the renovation of a municipal facility.

The project will replace the existing fire alarm system panels in the Rayburn House Office Building (RHOB) with new addressable voice-type fire alarm system panels, as well as associated activities, including architectural, electrical, fire protection, miscellaneous modifications, and hazardous material remediation. The work will not be a whole fire alarm system replacement, but rather only a head-end equipment replacement. New fire alarm panels will be located in Room G3-23 which will be dedicated to the fire control equipment and designated as Fire Command Center. The system will be zoned to correspond to a reasonable construction phasing plan. The actual construction phasing plan will be developed by the installing contractor and approved by the AOC. The contractor will disconnect all existing circuits from the existing fire alarm system panels and reconnect to the new addressable voice-type fire alarm system panels. Disconnecting individual visual notification circuits is not needed since complete NAC panels are being reused and connected to new fire alarm control panel. Following acceptance of the new system, the existing system will be demolished. Existing Autocall Transponder Cabinet (ATC) enclosures are to remain as terminal interface cabinets. All Autocall control equipment shall be disconnected and removed from these enclosures and turned over to the AOC. Value: $ 5,000,000 - $ 10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contact the GC bidder(s) for access to all documents.

Post-Bid

Municipal

$10,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
5
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

February 25, 2026

Project location map

45 Independence Ave SW, Washington, DC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.