Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 27, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Dallas, Texas. Completed plans call for site work for a water / sewer project.
Central Regional Wastewater System Nutrient Improvements Estimate: $90M-$95M Wastewater Treatment Process Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. One mandatory Pre-Proposal Meeting will be conducted at the Trinity River Authority's General Office at 5300 S. Collins St., Arlington TX, 76018 on March 25, 2026 at 10:00 AM. A Pre-Proposal Site Visit will be conducted at the Trinity River Authority's Central Regional Wastewater System Treatment Plant, 6500 W. Singleton Blvd., Dallas, Texas 75212 on March 25, 2026 at 2:00 PM. The site visit is mandatory for all proposers. The site visit will follow the Pre-Proposal Meeting that day which is being held at the TRA General Office. Prospective Proposers are reminded that all visitors attending the site visit MUST have work boots, hard hats and safety vests in order to walk through the plant facilities and buildings. No exceptions. Entry List procedures: Anyone wanting to attend the Pre-Proposal Site Visits must give 24 hours prior notice to Theo Chan, chantw@trinityra.org, 817-832-5231, providing name, company representing, purpose (Pre-Proposal Site Visit). Deadline for Questions 03/31/2026 at 2:00 PM CT The Project scope includes the following major items: -The construction of a fourth anaerobic digester tank with a reactor volume of 3 million gallons (3 MG) to provide additional digestion capacity, redundancy, and operating volume versus existing Digester Nos. 1, 2, and 3. -A dedicated digester mixing system for proposed Digester No. 4 which will consist of an externally pumped, hydraulically mixed nozzle system that will mix the digester contents using hydraulic jets. - A cooling heat exchanger to maintain optimum process temperatures for proposed Digester No. 4. - The construction of a WAS Storage Tank (WASST) adjacent to the existing PreDewatering and Thickening Building with a volume of 301,600 gallons to provide a control point between pumping WAS from the existing Final Clarifier Nos. 1-12 to the Gravity Belt Thickeners (GBTs). The WASST will convey flow to the GBTs via a GBT Feed Loop system which will include pumps, piping, supports, and associated hardware. - A chemical feed building located near proposed Digester No. 4 to house an alkalinity feed system which will send flow to the existing Digested Sludge Storage Tank (DSST). -Installation of Pre-Dewatering Centrifuge No. 6 along with all associated equipment, such as Centrifuge Feed Pump No. 6, Thickened Cake Pump No. 6, and Polymer Feed Pump No. 6. - The construction of a DMX Reactor System and all associated subsystems to reduce the nutrient loads returned to the influent of the CRWS Treatment Plant. - A Sidestream Treatment Building to house all the pumping equipment, electrical gear and miscellaneous items associated with the DMX Reactor System. - Demolition of offline structures, such as Primary Clarifier Nos. 1 and 2 along with any associated yard piping, manholes, pull boxes, conduit, drainage systems and appurtenances. -Installation of proposed yard piping, conduit, duct bank, drainage systems, general site improvements such as temporary erosion and sediment controls, grading and resurfacing, and paving
Post-Bid
Water / Sewer
$95,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
