Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 17, 2025 at 8:00 PM
Updated October 24, 2025
Site work and paving for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a one-story above grade sidewalk / parking lot.
Statement of Qualifications for Construction Inspection and Materials Testing for West Loop Shared Use Path and Bayou Bridge will be received. General scope of work includes Inspection Services and Laboratories Testing Services including reconstruction of street pavement, including driveways, curbs, sidewalks, bike paths, shared use path, wheelchair ramps, permanent signs, pavement markings, streetlights, traffic signals, water lines and services, storm sewers, detention facilities, and related appurtenances. Question Deadline 10/13/2025 at 5:00 PM CT: Questions concerning this Request for Qualifications shall be directed via the Q & A system *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construction Inspection and Materials Testing Services for West Loop Shared Use Path and Bayou Bridge (Uptown Memorial Park Trail and Bridge UMPTB) o Project name: West Loop Shared Use Path and Bayou Bridge aka Uptown Memorial Park Trail and Bridge (UMPTB) o Description: Construction of a 10'-14' wide shared use path along I-610 West Loop Frontage Road and in Memorial Park including bike sharrows on Hollyhurst Lane and intersection improvements along I610 West Loop at Uptown Park Boulevard, Woodway Drive, and Memoria Drive o Construction of a 350' long suspension bridge over Buffalo Bayou and approach bridge in Memorial Park Old Archery Range Construction of two timber bridges over Buffalo Bayou tributary ravines; One in Memorial Park Old Archery Range and a second on the southeast corner of Woodway at I610 West Loop o Project length: 1.9 miles o Location: Segments in Uptown Houston District, Memorial Park Old Archery Range, under I610 West Loop along Buffalo Bayou, Houston Arboretum and Nature Center, and Memorial Park The project aims to enhance active transportation infrastructure through a shared use path and bridge improvements from Memorial Drive to Post Oak Boulevard along I610 West Loop. The project includes the Memorial Drive / West Loop Northbound Frontage Road intersection, Woodway Drive / West Loop Northbound Frontage Road Intersection, Memorial Park Old Archery Range, Uptown Park Boulevard / West Loop Southbound Frontage Road Intersection, easement along Eden's Uptown Park Shoppes, and TxDOT ROW along I610 West Loop within the project limits.
Post-Bid
Sidewalks / Parking Lot
$21,000,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
March 2, 2026
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
Bid Date: Oct 24 2025
Houston, TX
Bid Date: Oct 24 2025
Houston, TX
Bid Date: Oct 23 2025
Houston, TX
Bid Date: Oct 24 2025
Houston, TX
--
Houston, TX
Bid Date: Sep 25 2025
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Oct 07 2025
Houston, TX
Bid Date: Oct 14 2025
Houston, TX
Bid Date: Oct 27 2025
Houston, TX
--
Houston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
