BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 24, 2025

Site work and paving for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a one-story above grade sidewalk / parking lot.

Statement of Qualifications for Construction Inspection and Materials Testing for West Loop Shared Use Path and Bayou Bridge will be received. General scope of work includes Inspection Services and Laboratories Testing Services including reconstruction of street pavement, including driveways, curbs, sidewalks, bike paths, shared use path, wheelchair ramps, permanent signs, pavement markings, streetlights, traffic signals, water lines and services, storm sewers, detention facilities, and related appurtenances. Question Deadline 10/13/2025 at 5:00 PM CT: Questions concerning this Request for Qualifications shall be directed via the Q & A system *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construction Inspection and Materials Testing Services for West Loop Shared Use Path and Bayou Bridge (Uptown Memorial Park Trail and Bridge UMPTB) o Project name: West Loop Shared Use Path and Bayou Bridge aka Uptown Memorial Park Trail and Bridge (UMPTB) o Description: Construction of a 10'-14' wide shared use path along I-610 West Loop Frontage Road and in Memorial Park including bike sharrows on Hollyhurst Lane and intersection improvements along I610 West Loop at Uptown Park Boulevard, Woodway Drive, and Memoria Drive o Construction of a 350' long suspension bridge over Buffalo Bayou and approach bridge in Memorial Park Old Archery Range Construction of two timber bridges over Buffalo Bayou tributary ravines; One in Memorial Park Old Archery Range and a second on the southeast corner of Woodway at I610 West Loop o Project length: 1.9 miles o Location: Segments in Uptown Houston District, Memorial Park Old Archery Range, under I610 West Loop along Buffalo Bayou, Houston Arboretum and Nature Center, and Memorial Park The project aims to enhance active transportation infrastructure through a shared use path and bridge improvements from Memorial Drive to Post Oak Boulevard along I610 West Loop. The project includes the Memorial Drive / West Loop Northbound Frontage Road intersection, Woodway Drive / West Loop Northbound Frontage Road Intersection, Memorial Park Old Archery Range, Uptown Park Boulevard / West Loop Southbound Frontage Road Intersection, easement along Eden's Uptown Park Shoppes, and TxDOT ROW along I610 West Loop within the project limits.

Post-Bid

Sidewalks / Parking Lot

$21,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
219
Bidding Soon
3,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

March 2, 2026

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.