BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2025 at 8:00 PM

Updated October 16, 2025

Site work and renovation of a mixed-use development in Hazard, Kentucky. Completed plans call for the renovation of a residential development; for site work for a road / highway; and water / sewer project.

The proposed project consists of one site located in Hazard, Ky. A large slide has occurred just above the home and is currently active. Drainage is seeping through the slide area and causing the slope to stay fully saturated. The homeowner has tried to keep the slide material cleaned up but it continues to come down on and around their home. In addition to the slide, there's a steady flow of drainage coming from the middle of the slide and is pooling up around the home's foundation. Reclamation plans will include removing slide material and hauling it to an offsite waste area, stabilizing the toe of the slope behind the home with a concrete retaining wall and subdrain to transport drainage to the roadside ditch. Other features will include ditches along Boone Ledge Drive. Estimated Length of Project: (Substantial Completion) + 270 Calendar Days (Final Completion) Federal Funding Source One hundred percent funding for this project has been authorized by the U.S. Department of the Interior, Office of Surface Mining, under the provisions of 29 CFR 5.5 Davis Bacon Act Requirements.Funds for this project are subject to the 29 CFR 5.5 Davis Bacon Act Requirements, of which are included in the specification book. Contractors and subcontractors must pay laborers and mechanics employed on the project's work site on a weekly basis, no less than the wages and benefits that are prevailing in the area as determined by the federal Secretary of Labor and in accordance to the wage scale provided. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business by the Kentucky Secretary of State and the Kentucky Department of Insurance within the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. Question Deadline 10/03/2025 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered.

Bid Results

Residential Subdivision

$757,760.00

Public - County

LEED Certification, Renovation, Site Work

12

7

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
91
Bidding Soon
737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 13, 2025

Project location map

101 Bulldog Ln, Hazard, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.