Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 3, 2026 at 8:00 PM
Updated June 11, 2026
Renovation of a municipal facility in Corner Brook, Newfoundland. Conceptual plans call for the renovation of a municipal facility.
The two existing hydraulic elevators in the building are original and have reached their useful life. Consultant is to: -Investigate the elevator systems and associated equipment and provide recommendations for replacement with new, modern elevators that adhere to the latest Elevator Codes and Standards ensuring improved functionality, accessibility, reliability, energy efficiency, enhanced safety, positioning systems, and noise/vibration control measures. -The consultant is responsible for documenting the existing system and defining performance requirements including ensuring full compatibility with architectural, electrical, mechanical, and structural systems. -The recommendations will consider updating electrical and mechanical components (as applicable), including but not limited to: controllers, machines, hoist ropes, roller guides, LED lighting, brakes, safety mechanisms, the cab and its interior, hall fixtures, ventilation systems, power supply, emergency backup power, door operators, communication systems, and control panels. -Provide a partial SLD and Arc Flash Study update representing the changes related to this scope after construction. -The new elevator system must maintain connection with the existing (Troy) fire alarm system. -It is preferred to maintain consistent operation of one elevator during construction, or shut downs to be scheduled after hours. If the recommended option(s) does not allow for this, the option recommendation(s) must include consideration of location and design of temporary office spaces on the main floor. -Review and consider the recommendations noted in the BGIS Integrated Systems Testing Plan dated September 2024. -The new elevator system must comply with CSA B44 and all other applicable codes. TIMELINE: RFP for engineering design has closed and no award will be made. Coverage of this report is discontinued at this time.
Project Abandoned
Municipal
$240,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2026
1 Regent Square, Corner Brook, NL
Related To This Project
Corner Brook, NL
Bid Date: Oct 17 2025
Corner Brook, NL
Bid Date: Nov 07 2025
Corner Brook, NL
Bid Date: Jan 19 2026
Corner Brook, NL
Bid Date: Feb 09 2026
Corner Brook, NL
Bid Date: Jan 20 2026
Corner Brook, NL
Bid Date: Jan 15 2026
Corner Brook, NL
Bid Date: Feb 19 2026
Corner Brook, NL
--
Corner Brook, NL
Bid Date: Dec 03 2025
Corner Brook, NL
Bid Date: Nov 06 2025
Corner Brook, NL
Bid Date: Sep 22 2025
Corner Brook, NL
Bid Date: Sep 18 2025
Corner Brook, NL
Bid Date: Sep 24 2025
Corner Brook, NL
Bid Date: Sep 04 2025
Corner Brook, NL
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed