BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 25, 2025

Site work and new construction of a mixed-use development in Biltmore Forest, North Carolina. Completed plans call for the construction of a fire / police facility; for site work for a fire / police facility; municipal facility; and municipal facility.

Question Deadline 10/10/2025 at 12:00 PM ET RESPONSES TO FINAL QUESTIONS PROVIDED: 12:00 PM, Oct 17, 2025 Pre-Submittal Conference: 10:00 AM, Friday, October 3, 2025 Email project architect listed above with a list of names and emails for requested attendees by no later than 04:00 PM on Thursday, October 2, 2025. Virtual meeting invitation to be distributed by list. SCOPE OF WORK AND SERVICES The outline scope of services below is meant to give Firms an outline of the minimum services required for this project. A. PHASE 1 PRE-CONSTRUCTION SERVICES 1. BUILDING DESIGN Develop 100% Schematic cost estimate and schedule; Develop 50% Construction Document cost estimate and schedule; Reconcile cost differences from Previous Phase. Develop 100% Construction Documents cost estimate and schedule; Reconcile cost differences from Previous Phase. Develop material for public presentations; assist with presentations. Regularly attend meetings with the Owner and Architect prior to construction and consult with the Owner and the Architect regarding site use, site improvements and selection of building materials. Develop a provisional and final CPM schedules indicating methods and sequencing of procurement, permitting, construction and closeout of project. Include time requirements for sequences and durations, milestones dates for receipt and approval of design documents, receipt of regulatory approvals and permits, preparation and processing of shop drawings and samples, delivery schedule of materials or equipment requiring long-lead time procurement, project procurement schedule, and installation and construction completion. Include critical milestone dates for Owner procured and installed fixtures, furnishings and equipment. Provide periodic updates of project schedule for Architects review and Owner approval. Perform a constructability review of the design documents at each phase of design.

Post-Bid

Fire / Police

$11,500,000.00

Public - City

New Construction, Site Work

12

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
1
Bidding Soon
739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

July 1, 2026

Project location map

Multiple Locations, Biltmore Forest, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.