Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 25, 2025
Site work and new construction of a mixed-use development in Biltmore Forest, North Carolina. Completed plans call for the construction of a fire / police facility; for site work for a fire / police facility; municipal facility; and municipal facility.
Question Deadline 10/10/2025 at 12:00 PM ET RESPONSES TO FINAL QUESTIONS PROVIDED: 12:00 PM, Oct 17, 2025 Pre-Submittal Conference: 10:00 AM, Friday, October 3, 2025 Email project architect listed above with a list of names and emails for requested attendees by no later than 04:00 PM on Thursday, October 2, 2025. Virtual meeting invitation to be distributed by list. SCOPE OF WORK AND SERVICES The outline scope of services below is meant to give Firms an outline of the minimum services required for this project. A. PHASE 1 PRE-CONSTRUCTION SERVICES 1. BUILDING DESIGN Develop 100% Schematic cost estimate and schedule; Develop 50% Construction Document cost estimate and schedule; Reconcile cost differences from Previous Phase. Develop 100% Construction Documents cost estimate and schedule; Reconcile cost differences from Previous Phase. Develop material for public presentations; assist with presentations. Regularly attend meetings with the Owner and Architect prior to construction and consult with the Owner and the Architect regarding site use, site improvements and selection of building materials. Develop a provisional and final CPM schedules indicating methods and sequencing of procurement, permitting, construction and closeout of project. Include time requirements for sequences and durations, milestones dates for receipt and approval of design documents, receipt of regulatory approvals and permits, preparation and processing of shop drawings and samples, delivery schedule of materials or equipment requiring long-lead time procurement, project procurement schedule, and installation and construction completion. Include critical milestone dates for Owner procured and installed fixtures, furnishings and equipment. Provide periodic updates of project schedule for Architects review and Owner approval. Perform a constructability review of the design documents at each phase of design.
Post-Bid
Fire / Police
$11,500,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2025
July 1, 2026
Multiple Locations, Biltmore Forest, NC
Related To This Project
Biltmore Forest, NC
--
Biltmore Forest, NC
Bid Date: Feb 27 2024
Cullowhee, NC
Bid Date: Oct 02 2025
Smithfield, NC
Bid Date: Oct 17 2025
Winston Salem, NC
--
Greenville, NC
Bid Date: Dec 04 2025
Cherokee, NC
Bid Date: Oct 23 2025
Millers Creek, NC
Bid Date: Oct 16 2025
Raleigh, NC
Bid Date: Oct 10 2025
Bolivia, NC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
