Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 13, 2025 at 7:00 PM
Updated November 14, 2025
Renovation of an educational facility in Houston, Texas. Completed plans call for the renovation of a one-story above grade educational facility.
There are no documents. It will have to be measured and bid by interested contractors. The scope of work includes the following items for the renovation and upgrades of the Jess Adkins Gymnasium: prep and paint all bleachers with burgundy color; prep and paint the concrete area under bleachers and steps with epoxy grey with black fleck; prep and paint all hand railings around the bleachers on the inside with burgundy; prep and paint outside hand railings, posts, and awning in the front entrance with burgundy; prep and paint doors to locker rooms and all doors to under bleacher storage areas with burgundy and repair to ensure doors will close and lock; repair and refinish doors on both sides of the stage and storage area beside the stage and ensure doors close and lock; replace three double doors on the interior side of the gym leading to the hallway, prep and paint with burgundy along with all hardware to ensure doors close and lock; repair or replace two exterior entrance doors from circle drive, prep and paint with burgundy along with all hardware to ensure doors close and lock; repair or replace interior doors connecting gym to cafeteria, prep and paint burgundy along with all hardware to ensure doors close and lock; install vinyl floating floor in four entrance ways over existing tile and include the cost of the vinyl floating floor; paint brick walls in front of the bleachers and bleacher area with grey paint; install vinyl siding on ends of bleachers to cover sheet rock; install mats around the front of stage, beneath both bleacher areas, and along the front entrance between both entrance doors (mats will be supplied); include cost of labor, materials, and landfill except for mats. Sealed bids are required.
Under Construction
Educational
$59,254.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2025
November 10, 2025
901 Bagby Street Houston TX, Houston, TX
Related To This Project
Houston, TX
Bid Date: Oct 27 2025
Houston, TX
Bid Date: Nov 06 2025
Houston, TX
Bid Date: Oct 28 2025
Houston, TX
Bid Date: Oct 15 2025
Houston, TX
Bid Date: Oct 30 2025
Houston, TX
Bid Date: Oct 10 2025
Houston, TX
Bid Date: Oct 15 2025
Houston, TX
Bid Date: Oct 08 2025
Houston, TX
Bid Date: Oct 14 2025
Houston, TX
Bid Date: Oct 14 2025
Houston, TX
Bid Date: Oct 15 2025
Houston, TX
Bid Date: Oct 15 2025
Houston, TX
--
Houston, TX
Bid Date: Nov 10 2025
Houston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
