BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Sahuarita, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; water / sewer project; and for outdoor lighting for a road / highway.

019 PM 060 Nogales - Tucson Highway (I-19) (I-19 Irvington TI) The proposed project is located in Pima County on Interstate 19 (I-19) between mileposts 60.52 and 61.62, in Tucson. The work consists of improvements to the Irvington Road TI, including but not limited to constructing a new ramp, widening existing ramps, milling and replacing existing asphaltic concrete on Irvington Road with new asphaltic concrete, removing the existing bridge and constructing a new bridge. The work also includes constructing retaining walls, concrete barriers, storm drains, guardrails, landscaping, erosion control, signing, pavement marking, lighting, and other miscellaneous work. SouthCent District Engineering Specialist: Brandon Campbell Question Deadline 03/31/2026 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in the Construction Phase of the contract will be 615 calendar days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 365 calendar days. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. AZDOT - Capacity Additions (Engineering) - Interstate 19 pn-30902634.001

Bid Results

Bridges / Tunnels

$56,396,832.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

573

10

57

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

June 16, 2026

Project location map

I-19, Sahuarita, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.