Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Sahuarita, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; water / sewer project; and for outdoor lighting for a road / highway.
019 PM 060 Nogales - Tucson Highway (I-19) (I-19 Irvington TI) The proposed project is located in Pima County on Interstate 19 (I-19) between mileposts 60.52 and 61.62, in Tucson. The work consists of improvements to the Irvington Road TI, including but not limited to constructing a new ramp, widening existing ramps, milling and replacing existing asphaltic concrete on Irvington Road with new asphaltic concrete, removing the existing bridge and constructing a new bridge. The work also includes constructing retaining walls, concrete barriers, storm drains, guardrails, landscaping, erosion control, signing, pavement marking, lighting, and other miscellaneous work. SouthCent District Engineering Specialist: Brandon Campbell Question Deadline 03/31/2026 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in the Construction Phase of the contract will be 615 calendar days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 365 calendar days. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. AZDOT - Capacity Additions (Engineering) - Interstate 19 pn-30902634.001
Bid Results
Bridges / Tunnels
$56,396,832.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2026
June 16, 2026
I-19, Sahuarita, AZ
Related To This Project
Sahuarita, AZ
--
Sahuarita, AZ
Bid Date: Jun 23 2026
Sahuarita, AZ
--
Sahuarita, AZ
--
Sahuarita, AZ
Bid Date: Oct 03 2024
Sahuarita, AZ
Bid Date: Aug 29 2024
Sahuarita, AZ
Bid Date: Aug 20 2024
Sahuarita, AZ
Bid Date: Jun 20 2024
Sahuarita, AZ
Bid Date: Jun 06 2024
Sahuarita, AZ
Bid Date: Apr 23 2024
Sahuarita, AZ
Bid Date: Jun 11 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
