BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 20, 2025

Site work for a playground / park / athletic field in Austin, Texas. Completed plans call for site work for a playground / park / athletic field.

Question Deadline 12/12/2025 Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the system for such information to Engineer not less than five (5) calendar days before the Bid opening. Project No. 89-21-233 Scope of Work of the Contract Documents includes the following: Earthwork, mass grading, site retaining walls, detention ponds, onsite utilities, storm lift stations, paving and landscaping. Bids received after the closing time will be returned unopened. Each Bid must be accompanied by a Bid bond or certified cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within one (1) business day of receipt of the bid opening. By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an electronic signature. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the resposible bidder, which will be most advantageous and result in the best and most economical completion of the Project. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with the requirement of that subchapter. Substantial Completion of the Work within 335 calendar days + Final Completion of the Work within 60 calendar days after Substantial Completion.

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - County

Site Work

204

7

2

2

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
142
Bidding Soon
2,675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

January 19, 2026

Project location map

Multiple Locations, Austin, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.