Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2026 at 7:00 PM
Updated January 28, 2026
Demolition, site work and addition to a civil project in Waxahachie, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
*As of December 15, 2025, bids received from this bid package are currently under evaluation. Construction work is expected to start early 2026. Red Oak Creek Regional Water System Proposal Package 1 - Peak Flow Storage Tanks Package 1 is exclusively for the two Peak Flow Storage Tanks No. 2 & 3 as identified further in the Proposal Form in Project Documents. Question Deadline 10/21/2025 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via CivCast. Work of this Project generally includes expansion of the Red Oak Creek Regional Water System from 6.0 MGD to 12.0 MGD. The project will include two Phases, Phase 1 Expansion from 6.0 to 8.0 MGD is needed as the first priority, followed by Phase 2 Expansion from 8.0 to 12.0 MGD. More specifically, the Work includes, but is not limited to, construction of the following: PHASE 1 1. Add 2ea Peak Flow Storage Tanks (7MG each), including yard piping, odor control system, electrical, instrumentation and controls. 2. Expand existing Aeration Basin 1C to match existing Train 2 operation. 3. Add a 7.5 MGD pump at Lift Station No. 2 inlcuding connection to existing header, piping and valves. 4. Add a WAS tank mixer to the existing tank. PHASE 2 1. Add a new Administration/Lab Building adjacent to the existing building 2. Add a new influent coarse screen facility and all necessary underground utility modifications 3. Replace the existing pumps in the influent pump station to increase the firm capacity from 15 MGD to 42 MGD 4. Add a third drum screen and a third grit removal unit 5. Add additional aeration basin (new trains) and secondary clarifiers 6. Add clarifier influent and effluent splitter box 7. Add new filtration facility to handle a capacity up to 42 MGD 8. Add new UV disinfection to handle a capacity up to 42 MGD
Post-Bid
Water / Sewer
$1,000,000.00
Public - State/Provincial
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
January 19, 2026
908 Bells Chapel Rd, Waxahachie, TX
Related To This Project
Waxahachie, TX
Bid Date: Nov 12 2025
Waxahachie, TX
--
Waxahachie, TX
Bid Date: Oct 22 2025
Waxahachie, TX
--
Waxahachie, TX
Bid Date: Oct 27 2025
Waxahachie, TX
--
Waxahachie, TX
Bid Date: Oct 15 2025
Waxahachie, TX
Bid Date: Oct 15 2025
Waxahachie, TX
Bid Date: Nov 12 2025
Waxahachie, TX
Bid Date: Nov 12 2025
Waxahachie, TX
Bid Date: Oct 20 2025
Waxahachie, TX
Bid Date: Oct 15 2025
Waxahachie, TX
Bid Date: Oct 15 2025
Waxahachie, TX
Bid Date: Nov 13 2025
Waxahachie, TX
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
